FORMAT
BOOKS
PACKAGES
EDITION
PUBLISHER
CONTENT TYPE
Act
Admin Code
Announcements
Bill
Book
CADD File
CAN
CEU
Charter
Checklist
City Code
Code
Commentary
Comprehensive Plan
Conference Paper
County Code
Course
DHS Documents
Document
Errata
Executive Regulation
Federal Guideline
Firm Content
Guideline
Handbook
Interpretation
Journal
Land Use and Development
Law
Legislative Rule
Local Amendment
Local Code
Local Document
Local Regulation
Local Standards
Manual
Model Code
Model Standard
Notice
Ordinance
Other
Paperback
PASS
Periodicals
PIN
Plan
Policy
Product
Product - Data Sheet
Program
Provisions
Requirements
Revisions
Rules & Regulations
Standards
State Amendment
State Code
State Manual
State Plan
State Standards
Statute
Study Guide
Supplement
Sustainability
Technical Bulletin
All
|
Description of PD IEC/TS 62647-1:2012 2012This part of the IEC/TS 62647 series defines the objectives of, and requirements for, documenting processes that assure customers and regulatory agencies that A DHP electronic systems containing Pb-free solder, piece parts, and PWBs will satisfy the applicable requirements for performance, reliability, airworthiness, safety, and certifiability throughout the specified life of performance. This specification aims to communicate requirements for a lead-free control plan (LFCP), hereinafter referred to as the Plan, and to assist the Plan owners in the development of their own Plans. The Plan documents the Plan owner’s processes to assure their customers and all other stakeholders that the Plan owner’s products will continue to meet their requirements, given the risks stated in the Introduction. This specification does not contain detailed descriptions of the processes to be documented but lists high-level requirements for such processes, and areas of concern to the A DHP industries that need to be addressed by the processes. Pb-free risk management should be accomplished through specific requirements added to the Plan owner’s existing infrastructure of product management and control. This specification applies to the ADHP electronics system supply chain. The control of the Pb-free activities will b e accomplished by the Plan owner addressing the requirements of their Customer. Th ese activities include, but are not limited to, those performed by the s ystem i ntegrator, the original equipment manufacturer (OEM), and their respective supply chains, to the lowest level possible. This should be done with the knowledge that, at the component level, the aerospace industry may not have a great influence over those suppliers. In such cases, the Plan owner assumes responsibility. Some applications may have unique requirements that exceed the scope of this specification . The extended scope should be covered separately. The requirements of this specification may be tailored to address unique/specific program needs. If tailoring is performed, the user will obtain documented customer concurrence. Annex A provides a tailoring template that may be used. This document may be used by other high-performance and high-reliability industries, at their discretion.
About BSIBSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses. |
GROUPS
|