Search book title
Filters:
FORMAT
BOOKS
PACKAGES
EDITION
to
PUBLISHER
(1)
(337)
(589)
(54)
(234)
(996)
(657)
(2161)
(117)
(94394)
(54)
(568)
(124)
(33)
(21)
(20)
(94534)
(3)
(17)
(1)
(374)
(315)
(6731)
(241)
(16)
(6)
(1646)
(17)
(19)
(28)
(4)
 
(6)
(7)
(115)
(3)
(57)
(5)
(5)
(1)
(1)
(2)
(25)
(27)
(27)
(13)
(61)
(24)
(22)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(31)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Product - Data Sheet
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Sustainability
 Technical Bulletin
 All
  • BSI
    BS EN 9102:2024 - TC Tracked Changes. Aerospace series. Quality systems. First article inspection requirements
    Edition: 2024
    $529.67
    / user per year

Description of BS EN 9102:2024 - TC 2024

1.1 General This document establishes the requirements for performing and documenting FAI. It is emphasized the requirements specified in this document are complementary (not alternative) to customer and applicable statutory and regulatory requirements. 1.2 Purpose The primary purpose of FAI is to verify and validate product realization processes are capable of producing characteristics that meet engineering and design requirements. A well-planned and executed FAI by a multi-disciplinary team (e.g. members from responsible functions) provides objective evidence the manufacturer’s processes can produce compliant product; having effectively understood and incorporated the associated requirements. NOTE A FAI is not a product acceptance document. While interrelated, FAI and product acceptance are separate activities. The focus of FAI is verification of production processes via assessment of product. FAI and supporting documentation do not provide assurance regarding conformance for product acceptance purposes; neither does the lack of a FAI necessarily imply product is nonconforming to engineering and design requirements. FAI will: - provide confidence, through objective evidence, the product realization processes are capable of producing conforming product; - demonstrate the manufacturers and processors of the product have an understanding of the associated requirements; - provide assurance of product conformance at the start of production and after changes, as outlined in this document. A FAI is intended to: - mitigate risks associated with production startup and process changes; - reduce future escapes; - help ensure product safety; - improve quality, delivery, and customer satisfaction; - reduce costs and production delays associated with product nonconformances; - identify product realization processes not capable of producing conforming characteristics and initiate and/or validate associated corrective actions. - 1.3 Application This document applies to organizations and their suppliers responsible for product realization processes that produce the design characteristics of the product. The organization shall flow down the requirements of this document to suppliers who produce design characteristics. This document also applies to suppliers performing special process(es). A certificate of conformance (CoC) provided by processors attests to satisfying the requirements. External suppliers providing special process(es) can satisfy this document's requirements by either: - documenting the design characteristics and associated results on a first article inspection report (FAIR); or - documenting the design characteristics and associated results on a detailed CoC. This document applies to assemblies, sub-assemblies, and detail parts including castings, forgings, and modifications to standard catalogue or commercial-off-the-shelf (COTS) items. Each of these items have a separate FAI. Unless contractually required, this document does not apply to: - development and prototype parts that are not considered as part of the first production run; - procured standard catalogue item, COTS, or deliverable software. When these items are included in an assembly, they shall be documented in the index of part numbers in an assembly FAIR. 1.4 Informative If there is a conflict between the requirements of this document, and customer or applicable statutory/regulatory requirements, the latter takes precedence. In this document, the following verbal forms are used: - "shall" indicates a requirement; - "should" indicates a recommendation; - "may" indicates a permission; - "can" indicates a possibility or a capability. Information marked as "NOTE" is for guidance in understanding or clarifying the associated requirement .

About BSI

BSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses.

X