FORMAT
BOOKS
PACKAGES
EDITION
PUBLISHER
CONTENT TYPE
Act
Admin Code
Announcements
Bill
Book
CADD File
CAN
CEU
Charter
Checklist
City Code
Code
Commentary
Comprehensive Plan
Conference Paper
County Code
Course
DHS Documents
Document
Errata
Executive Regulation
Federal Guideline
Firm Content
Guideline
Handbook
Interpretation
Journal
Land Use and Development
Law
Legislative Rule
Local Amendment
Local Code
Local Document
Local Regulation
Local Standards
Manual
Model Code
Model Standard
Notice
Ordinance
Other
Paperback
PASS
Periodicals
PIN
Plan
Policy
Product
Product - Data Sheet
Program
Provisions
Requirements
Revisions
Rules & Regulations
Standards
State Amendment
State Code
State Manual
State Plan
State Standards
Statute
Study Guide
Supplement
Sustainability
Technical Bulletin
All
|
Description of BS 5975:2019 2019This British Standard gives recommendations and guidance on the procedural controls to be applied to all aspects of temporary works in the construction industry. It also includes guidance on design, specification, construction, use and dismantling of falsework. This standard gives guidance on permissible stress design of all falsework. The guidance also applies to the design of class A falsework1 defined in BS EN 12812, the design of which is specifically excluded from BS EN 12812. Section 1 gives recommendations in relation to training and education. Section 2 gives recommendations for procedures to ensure that temporary works are conceived, designed, specified, constructed, used and dismantled all in a safe and controlled manner suitable for all construction projects. These procedures include clauses relating to all roles involved in temporary works: clients, permanent works designers, temporary works designers, contractors (including construction management organizations), suppliers and manufacturers. Construction sites and methods adopted for controlling the temporary works vary. This British Standard recognizes that the extent of control measures required are greater on the larger or more complex projects, as can be encountered on major infrastructure projects, power stations, airports etc. Generally procedures are to be in accordance with this standard but additional client specific procedures might be required on major infrastructure projects. Section 3 covers the design of temporary works and in particular the design of falsework and relevant formwork. In addition Section 3 covers: materials including material factors; loads and load factors; design of falsework, including both proprietary equipment and traditional scaffolding solutions; wind loading (reference to temporary and permanent stability) and reference to other British Standards for the design of structural steelwork, reinforced concrete and excavation support. Although Section 3 was written for permissible stress design, the design concepts and the service loads stated are applicable to limit state design. The loads, including wind loads, are the unfactored service loads and conform to both BS EN 1991‑1‑4 and BS EN 12812. The structural design element in this British Standard is additional information necessary for the structural design of falsework. It can be used in conjunction with existing structural standards. BS EN 12812 states that design class A is only to be adopted where:  a) slabs have a cross-sectional area not exceeding 0.3 m2 per metre width of slab;  b) beams have a cross-sectional area not exceeding 0.5 m2;  c) the clear span of beams and slabs does not exceed 6.0 m;  d) the height to the underside of the permanent structure does not exceed 3.5 m.
The following editions for this book are also available...
About BSIBSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses. |
GROUPS
|