Cart (0)
  • No items in cart.
Total
$0
There is a technical issue about last added item. You can click "Report to us" button to let us know and we resolve the issue and return back to you or you can continue without last item via click to continue button.
Search book title
Filters:
FORMAT
BOOKS
PACKAGES
EDITION
to
PUBLISHER
(1)
(337)
(589)
(54)
(234)
(996)
(657)
(2161)
(117)
(94624)
(54)
(568)
(124)
(33)
(21)
(20)
(94534)
(3)
(17)
(1)
(374)
(315)
(6731)
(241)
(16)
(6)
(1646)
(17)
(19)
(28)
(4)
 
(6)
(7)
(115)
(3)
(57)
(5)
(5)
(1)
(1)
(2)
(25)
(27)
(27)
(13)
(61)
(24)
(22)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(31)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Product - Data Sheet
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Sustainability
 Technical Bulletin
 All
  • BSI
    BS 1139-6:2014 Metal scaffolding - Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification
    Edition: 2014
    $442.60
    / user per year

Description of BS 1139-6:2014 2014

This part of BS 1139 specifies requirements for the structural design of prefabricated tower scaffolds utilizing components from mobile access and working towers specified in BS EN 1004 but in configurations that are outside of the scope of that standard.

These configurations include:

  1. prefabricated tower scaffolds outside the height limits of BS EN 1004;

  2. towers with more than one working platform;

  3. large deck tower scaffolds;

  4. linked tower scaffolds;

  5. cantilever tower scaffolds;

  6. stepped tower scaffolds;

  7. tower scaffolds used as a means of access;

  8. towers built on base plates instead of castors.

This British Standard applies to prefabricated tower scaffolds subject to wind loads up to and including 0.1 kN/m2.

NOTE Where a prefabricated tower scaffold might be subject to wind in excess of 0.1 kN/m2, and it cannot be dismantled or moved to avoid these winds, suitable wind design criteria can be found in BS EN 1991‑1‑4.

This British Standard does not cover prefabricated tower scaffolds using guys as a method of stabilization.



About BSI

BSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses.

X