Cart (0)
  • No items in cart.
Total
$0
There is a technical issue about last added item. You can click "Report to us" button to let us know and we resolve the issue and return back to you or you can continue without last item via click to continue button.
Search book title
Filters:
FORMAT
BOOKS
PACKAGES
EDITION
to
PUBLISHER
(1)
(337)
(589)
(54)
(234)
(996)
(657)
(2161)
(117)
(94394)
(54)
(568)
(124)
(33)
(21)
(20)
(94534)
(3)
(17)
(1)
(374)
(315)
(6631)
(241)
(16)
(6)
(1646)
(17)
(19)
(28)
(4)
 
(6)
(7)
(115)
(3)
(57)
(5)
(5)
(1)
(1)
(2)
(25)
(27)
(27)
(13)
(61)
(24)
(22)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(31)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Product - Data Sheet
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Sustainability
 Technical Bulletin
 All
  • ASTM
    E2356-10 Standard Practice for Comprehensive Building Asbestos Surveys
    Edition: 2010
    $160.99
    Unlimited Users per year

Description of ASTM-E2356 2010

ASTM E2356 - 10

Standard Practice for Comprehensive Building Asbestos Surveys

Active Standard ASTM E2356 | Developed by Subcommittee: D22.07

Book of Standards Volume: 11.07




ASTM E2356

Significance and Use

Management of asbestos-containing materials in buildings and facilities requires knowledge of the location, type, quantity, and condition of the material. The more complete and accurate the information available, the more appropriate and cost-effective are the control measures used to reduce possible exposure to airborne asbestos fibers. This is true whether the asbestos-containing materials remain undisturbed and completely intact, are selectively removed for maintenance or prior to renovation, or are removed to the greatest extent feasible before demolishing the building or facility.

This practice describes three types of surveys that support different objectives. These are the Baseline Survey, the Project Design Survey, and the Pre-Construction Survey.

The Baseline Survey is a building-wide or facility-wide inspection that provides a general sense of the overall location, type, quantity, and condition of asbestos-containing materials present. It is thorough in that most accessible functional spaces are inspected and bulk samples taken of suspect materials observed. The baseline survey provides information for long-term management of asbestos-containing materials and prioritization of response actions. The presence of asbestos in suspect materials may be assumed or presumed in some cases without bulk samples being taken or analyzed. However, the baseline survey is unobtrusive in that samples are not taken where doing so would result in objectionable damage to surfaces or where institutional barriers preclude access. In a baseline survey, destructive testing is avoided. Posting of signs and labels required for compliance with OSHA regulations would use the information generated during a Baseline Survey.

Note 1A Baseline Survey is sometimes called an AHERA survey because it provides the type of information used for management of asbestos-containing materials in schools. However, the baseline survey described in this practice requires inspection, bulk sampling, quantification, and assessment of suspect materials that are excluded by virtue of their type and location from the AHERA regulations for schools.

Note 2Suspect material subject to disturbance by planned or emergency maintenance may not always be identified as to asbestos content in a Baseline Survey. Collecting a single bulk sample, or a small number of samples, to determine if the material contains asbestos does not constitute a survey within the meaning of this practice. Nonetheless, the sample(s) should be collected in accordance with the methods described in Appendix X1 (this must be done by a properly-credentialed individual) and analyzed as set forth in 6.5.

The Project Design Survey is more focused than a Baseline Survey and is used to provide information to the Project Designer for preparing abatement plans and specifications. The locations inspected are limited to the areas that will be affected by the abatement project. If the project is being done prior to renovation or demolition, the construction plans or at least a clear statement of the scope of the renovation or demolition work are required for a proper Project Design Survey. Destructive testing is often required for a Project Design Survey. The presence of asbestos in suspect materials is always confirmed in a Project Design Survey rather than being assumed or presumed. Other information required for the Project Design is collected during the survey.

The Pre-Construction Survey is performed in anticipation of renovation or demolition where a Baseline Survey has not been conducted and there is no information, or insufficient information, as to the existence of asbestos-containing materials within the planned limits of construction. The Pre-Construction Survey requires destructive testing if concealed spaces are to be breached during construction. If asbestos-containing materials are found, a Project Design Survey is conducted to provide information for preparing the plans and specifications. The Pre-Construction Survey satisfies the EPA NESHAP requirements for renovation or demolition to thoroughly inspect the affected facility or the requirements of governmental agencies for issuance of a building permit.

The inter-relationships among the three types of surveys and with other ASTM asbestos control standards is shown in Fig. 1.

This practice emphasizes the concept that a Comprehensive Building Asbestos Survey consists of more than the collection and analysis of samples, and the report is more than a compilation of laboratory results. It is important to inspect as many functional spaces as possible and to document the reasons why certain functional spaces were not inspected and locations where no suspect materials were observed and, consequently, no samples were taken. Reasons might include access limitations, the absence of materials to sample, the existence of information from previous surveys, or the availability of reliable documentation such as Material Safety Data Sheets.

A Comprehensive Building Asbestos Survey is not limited to the class of materials commonly referred to as asbestos-containing building materials (ACBM), defined in the AHERA regulations as ... found in or on interior structural members or other parts of a building. Items that are difficult to distinguish as such may include cooling towers, laboratory hoods, gaskets, chalkboards, and other articles. These may be installed in, attached to, or adjacent to the building or facility but are not as clearly a part of the building or facility as fireproofing or floor tile. Nonetheless, such items still fall within the scope of an asbestos management program and therefore are addressed in this practice. Locations outside the building, in particular equipment in industrial facilities and power plants, and crawl spaces underneath the building are within the scope of a Comprehensive Building Asbestos Survey.

This practice is intended to be used by individuals who are conducting a Comprehensive Building Asbestos Survey for the owner or manager of a building or facility under a contractual arrangement for services as well as by employees of the owner or manager. If the individual is conducting the survey under a contractual arrangement (which may be with the firm employing the individual), the owner or manager of the building is still responsible for certain activities as described in this practice.

1. Scope

1.1 This practice describes procedures for conducting comprehensive surveys of buildings and facilities for the purpose of locating, identifying, quantifying, and assessing asbestos-containing materials.

1.2 The results of a Comprehensive Building Asbestos Survey are intended to be used for ongoing management of asbestos-containing materials, including Operations and Maintenance (O & M), removal, and other response actions. This includes response actions associated with renovations. A Comprehensive Building Asbestos Survey is also intended to provide information required for removal of asbestos-containing materials prior to demolition of a building or facility.

1.3 This practice discusses three types of surveys: Baseline Surveys, Project Design Surveys, and Pre-Construction Surveys.

1.4 This practice discusses the following activities for each of the above types of surveys:

1.4.1 Planning the survey to meet defined objectives;

1.4.2 Obtaining and reviewing information on the building or facility including previous surveys and response actions;

1.4.3 Conducting the physical activities of inspecting the premises and collecting bulk samples of suspect materials;

1.4.4 Analyzing the bulk samples for asbestos type and content;

1.4.5 Assessing the Current Condition and Potential for Disturbance of asbestos-containing materials; and

1.4.6 Preparing a report that includes a narrative discussion of the findings, tabulations of inspection, sampling and analysis results, graphical depiction of the areas inspected, and the results of the assessment.

1.5 A Comprehensive Building Asbestos Survey provides sufficient information about the asbestos-containing materials in a building or facility for purposes of a real property transaction. In situations where the amount of information required by a party to the transaction is minimal, a Limited Asbestos Screen (see Practice E2308 ) may suffice in place of the Comprehensive Building Asbestos Survey.

1.6 This practice does not include air sampling or surface (dust) sampling for purposes of evaluating a potential exposure hazard from airborne asbestos fibers.

1.7 Warning Asbestos fibers are acknowledged carcinogens. Breathing asbestos fibers can result in disease of the lungs including asbestosis, lung cancer, and mesothelioma. Precautions in this practice should be taken to avoid creating and breathing airborne asbestos particles from materials known or suspected to contain asbestos. See 2.2 for regulatory requirements addressing asbestos.

1.8 The values stated in SI units are to be regarded as standard. The values given in parentheses are mathematical conversions to inch-pound units that are provided for information only and are not considered standard.

1.9 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.


2. Referenced Documents (purchase separately) The documents listed below are referenced within the subject standard but are not provided as part of the standard.

ASTM Standards

E631 Terminology of Building Constructions

E736 Test Method for Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members

E1368 Practice for Visual Inspection of Asbestos Abatement Projects

E1494 Practice for Encapsulation Testing of Friable Asbestos-Containing Surfacing Materials

E2308 Guide for Limited Asbestos Screens of Buildings

E2394 Practice for Maintenance, Renovation, and Repair of Installed Asbestos Cement Products

Other Documents

StateofNewYorkEnviro Transmission Electron Microscopy Method for identifying and Quantifying Asbestos in Non-Friable Organically Bound Bulk Samples, March 1, 1997

Keywords

Asbestos; Comprehensive building asbestos survey;


ICS Code

ICS Number Code 91.100.40 (Products in fibre-reinforced cement)


DOI: 10.1520/E2356-10

ASTM International is a member of CrossRef.

ASTM E2356

The following editions for this book are also available...

This book also exists in the following packages...

Year Publisher Title Annual Price
VAR
ASTM
[+] $1,164.67 Buy
VAR
ASTM
[+] $5,933.17 Buy

Subscription Information

MADCAD.com ASTM Standards subscriptions are annual and access is unlimited concurrency based (number of people that can access the subscription at any given time) from single office location. For pricing on multiple office location ASTM Standards Subscriptions, please contact us at info@madcad.com or +1 800.798.9296.

 

Some features of MADCAD.com ASTM Standards Subscriptions are:

- Online access: With MADCAD.com’ s web based subscription service no downloads or installations are required. Access ASTM Standards from any browser on your computer, tablet or smart phone.

- Immediate Access: As soon as the transaction is completed, your ASTM Standards Subscription will be ready for access.

 

For any further information on MADCAD.com ASTM Standards Subscriptions, please contact us at info@madcad.com or +1 800.798.9296.

 

About ASTM

ASTM International, formerly known as the American Society for Testing and Materials (ASTM), is a globally recognized leader in the development and delivery of international voluntary consensus standards. Today, some 12,000 ASTM standards are used around the world to improve product quality, enhance safety, facilitate market access and trade, and build consumer confidence. ASTM’s leadership in international standards development is driven by the contributions of its members: more than 30,000 of the world’s top technical experts and business professionals representing 150 countries. Working in an open and transparent process and using ASTM’s advanced electronic infrastructure, ASTM members deliver the test methods, specifications, guides, and practices that support industries and governments worldwide.

X