Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

NFPA 770: Standard on Hybrid (Water and Inert Gas) Fire Extinguishing Systems, 2021
- Important Notices and Disclaimers
- Additional Important Notices and Disclaimers
- Chapter 1 Administration [Go to Page]
- 1.1 Scope.
- 1.2 Purpose.
- 1.3 Retroactivity.
- 1.4 Equivalency.
- 1.5 Units of Measurement.
- Chapter 2 Referenced Publications [Go to Page]
- 2.1 General.
- 2.2 NFPA Publications.
- 2.3 Other Publications.
- 2.4 References for Extracts in Mandatory Sections.
- Chapter 3 Definitions [Go to Page]
- 3.1 General.
- 3.2 NFPA Official Definitions.
- 3.3 General Definitions
- Chapter 4 General Information [Go to Page]
- 4.1 Use and Limitations.
- 4.2 Safety Considerations.
- 4.3 Use Restrictions
- 4.4 Qualifications.
- Chapter 5 Components [Go to Page]
- 5.1 Water Supply.
- 5.2 Inert Gas Agent Supply.
- 5.3 Storage Containers.
- 5.4 Pipe, Fittings, and Valves.
- 5.5 Hybrid Nozzles.
- 5.6 Detection, Actuation, Alarm, and Control Systems.
- Chapter 6 Application and Fire Test Protocols [Go to Page]
- 6.1 General.
- 6.2 Listing or Approval Evaluations.
- 6.3 Performance Objectives.
- 6.4 Application Parameters.
- 6.5 Flooding Factor.
- Chapter 7 System Design Requirements [Go to Page]
- 7.1 General.
- 7.2 Pipe Network Layout and Design.
- Chapter 8 Design Requirements for Total Flooding Systems [Go to Page]
- 8.1 General.
- 8.2 Enclosure Requirements.
- 8.3 System Performance Characteristics.
- 8.4 Hybrid Media Quantity.
- 8.5 Concentration of Oxygen.
- 8.6 Hybrid Media Retention for Prevention of Re-ignition.
- 8.7 Hybrid Nozzle Selection, Quantity, and Location.
- Chapter 9 Design Requirements for Local Application Systems [Go to Page]
- 9.1 General.
- 9.2 Hazard Specifications.
- 9.3 Nozzle Selection, Quantity, and Location.
- 9.4 Discharge Rate.
- 9.5 Discharge Time.
- 9.6 Hybrid Media Quantity.
- Chapter 10 Design Requirements for Marine Systems (Reserved)
- Chapter 11 System Documentation [Go to Page]
- 11.1 System Working Plans.
- 11.2 System Flow Documentation.
- 11.3 Detection, Actuation, and Control Systems Documentation.
- 11.4 Owner’s Documentation.
- 11.5 System Information Sign.
- Chapter 12 Installation Requirements [Go to Page]
- 12.1 General.
- 12.2 Nozzles.
- 12.3 Hazardous Locations.
- 12.4 Electrical Clearances.
- 12.5 Pipe Network.
- 12.6 Gas and Water Storage Containers.
- 12.7 Valves and Pressure Gauges.
- 12.8 Electrical Equipment and Systems.
- 12.9 System Review and Testing.
- Chapter 13 Acceptance Testing [Go to Page]
- 13.1 Approval of Installations.
- 13.2 Acceptance Requirements.
- 13.3 System Design Information Sign.
- 13.4 Owner’s Documentation.
- Chapter 14 Inspection, Testing, and Maintenance [Go to Page]
- 14.1 General.
- 14.2 Periodic Inspection and Maintenance.
- 14.3 Hose Test.
- 14.4 Inert Gas Agent Container Test.
- 14.5 Water Storage Container Inspection and Test.
- 14.6 Actuation/Impairment.
- 14.7 Training.
- 14.8 Corrections and Repairs.
- Chapter 15 Impairment [Go to Page]
- 15.1 General.
- 15.2 Impairment Coordinator.
- 15.3 Tag Impairment System.
- 15.4 Impaired Equipment.
- 15.5 Preplanned Impairment Programs.
- 15.6 Emergency Impairments.
- 15.7 Restoring Systems to Service.
- Annex A Explanatory Material
- Annex B Fire Test Methods
- Annex C Informational References [Go to Page]