Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
NFPA 1961: Standard on Fire Hose, 2013
- Important Notices and Disclaimers
- Additional Notices and Disclaimers
- Chapter 1 Administration [Go to Page]
- 1.1 Scope
- 1.2 Purpose
- 1.3 Equivalency
- 1.4 Retroactivity
- 1.5 SI Units
- 1.6 Referenced Standards
- Chapter 2 Referenced Publications [Go to Page]
- 2.1 General
- 2.2 NFPA Publications
- 2.3 Other Publications
- 2.4 References for Extracts in Mandatory Sections
- Chapter 3 Definitions [Go to Page]
- 3.1 General
- 3.2 NFPA Official Definitions
- 3.3 General Definitions
- Chapter 4 General Requirements [Go to Page]
- 4.1 Scope
- 4.2 Corrosion Control Overview
- 4.3 Control Center
- 4.4 Sources of Power
- 4.5 Records
- 4.6 Noncombustible Material
- Chapter 5 Plant Siting and Layout [Go to Page]
- 5.1 Scope
- 5.2 Plant Site Provisions
- 5.3 Site Provisions for Spill and Leak Control
- 5.4 Buildings and Structures.
- 5.5 Designer and Fabricator Competence
- 5.6 Soil Protection for Cryogenic Equipment
- 5.7 Falling Ice and Snow
- 5.8 Concrete Design and Materials.
- 5.9 Portable LNG Facility
- Chapter 6 Process Equipment [Go to Page]
- 6.1 Scope
- 6.2 Installation of Process Equipment
- 6.3 Pumps and Compressors
- 6.4 Flammable Refrigerant and Flammable Liquid Storage
- 6.5 Process Equipment
- Chapter 7 Stationary LNG Storage [Go to Page]
- 7.1 Scope
- 7.2 General.
- 7.3 Design Considerations
- 7.4 Tank Systems.
- 7.5 ASME Containers Designed for Operation at More Than 15 psi (103 kPa)
- Chapter 8 Vaporization Facilities [Go to Page]
- 8.1 Scope
- 8.2 Classification of Vaporizers
- 8.3 Design and Materials of Construction
- 8.4 Vaporizer Piping, Intermediate Fluid Piping, and Storage Valves
- 8.5 Relief Devices on Vaporizers
- 8.6 Combustion Air Supply
- 8.7 Products of Combustion
- Chapter 9 Piping Systems and Components [Go to Page]
- 9.1 Scope
- 9.2 General
- 9.3 Materials of Construction
- 9.4 Installation
- 9.5 Pipe Supports
- 9.6 Piping Identification
- 9.7 Inspection, Examination, and Testing of Piping
- 9.8 Purging of Piping Systems
- 9.9 Safety and Relief Valves
- 9.10 Corrosion Control
- 9.11 Cryogenic Pipe-in-Pipe Systems.
- Chapter 10 Instrumentation and Electrical Services [Go to Page]
- 10.1 Scope
- 10.2 Liquid Level Gauging
- 10.3 Pressure Gauging
- 10.4 Vacuum Gauging
- 10.5 Temperature Indicators
- 10.6 Emergency Shutdown
- 10.7 Electrical Equipment
- 10.8 Electrical Grounding and Bonding
- Chapter 11 Transfer Systems for LNG, Refrigerants, and Other Flammable Fluids [Go to Page]
- 11.1 Scope
- 11.2 General Requirements
- 11.3 Piping System
- 11.4 Pump and Compressor Control
- 11.5 Marine Shipping and Receiving
- 11.6 Tank Vehicle and Tank Car Loading and Unloading Facilities
- 11.7 Pipeline Shipping and Receiving
- 11.8 Hoses and Arms
- 11.9 Communications and Lighting
- Chapter 12 Fire Protection, Safety, and Security [Go to Page]
- 12.1 Scope
- 12.2 General
- 12.3 Emergency Shutdown (ESD) Systems
- 12.4 Fire and Leak Detection
- 12.5 Fire Protection Water Systems
- 12.6 Fire Extinguishing and Other Fire Control Equipment
- 12.7 Maintenance of Fire Protection Equipment
- 12.8 Personnel Safety
- 12.9 Security
- Chapter 13 Requirements for Stationary Applications Using ASME Containers [Go to Page]
- 13.1 Scope
- 13.2 General Requirements
- 13.3 Containers
- 13.4 Container Filling
- 13.5 Container Foundations and Supports
- 13.6 Container Installation
- 13.7 Automatic Product Retention Valves
- 13.8 LNG Spill Containment
- 13.9 Inspection
- 13.10 Shop Testing of LNG Containers
- 13.11 Shipment of LNG Containers
- 13.12 Field Testing of LNG Containers
- 13.13 Welding on Containers
- 13.14 Piping
- 13.15 Container Instrumentation
- 13.16 Fire Protection and Safety
- 13.17 Gas Detection
- 13.18 Operations and Maintenance
- Chapter 14 Operating, Maintenance, and Personnel Training [Go to Page]
- 14.1 Scope
- 14.2 General Requirements
- 14.3 Manual of Operating Procedures
- 14.4 Emergency Procedures
- 14.5 Monitoring Operations.
- 14.6 Transfer of LNG and Flammables.
- 14.7 Maintenance Manual
- 14.8 Maintenance
- 14.9 Personnel Training
- 14.10 Records
- Chapter 15 Performance (Risk Assessment) Based LNG Plant Siting [Go to Page]
- 15.1 Scope
- 15.2 General Requirements
- 15.3 Definitions
- 15.4 Risk Calculations and Basis of Assessment
- 15.5 LNG and Other Hazardous Materials Release Scenarios
- 15.6 Release Probabilities and Conditional Probabilities
- 15.7 Environmental Conditions and Occurrence Probabilities
- 15.8 Hazard and Consequence Assessment
- 15.9 Risk Result Presentation
- 15.10 Risk Tolerability Criteria
- 15.11 Risk Mitigation Approaches
- Annex A Explanatory Material
- Annex B Seismic Design of LNG Plants
- Annex C Security
- Annex D Training
- Annex E Informational References
- Index
- Formal Interpretation [Go to Page]