PD IEC/TS 62257-1:2015 - TC Tracked Changes. Recommendations for renewable energy and hybrid systems for rural electrification - General introduction to IEC 62257 series and rural electrification, 2020
- 30321357_New.pdf [Go to Page]
- 30332495-VOR.pdf [Go to Page]
- CONTENTS
- FOREWORD
- INTRODUCTION
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations
- 4 Methodology for rural electrification using hybrid renewable energy systems [Go to Page]
- 4.1 Rural electrification: which solution to choose?
- 4.2 Decentralized electrification requiring a range of systems
- 5 How to use the IEC 62257 series for a rural electrification project [Go to Page]
- 5.1 Overview
- 5.2 Review of the IEC 62257 series: links with the phases of a rural electrification project (see Table 3) [Go to Page]
- 5.2.1 Opportunity study
- 5.2.2 Specification of a project
- 5.2.3 Feasibility study of a project
- 5.2.4 Detailed technical studies
- 5.2.5 Implementation of a project
- 5.2.6 Validation of a project
- 5.2.7 On field operation
- Annex A (normative) Terms, definitions and abbreviations in use in the IEC 62257 series
- Figures [Go to Page]
- Figure 1 – Example of electrification progress following a master plan methodology
- Figure 2 – Example of electrification of a village using both CESs and IESs
- Figure 3 – Contractual relationshipbetween project participants – (IEC TS 62257-3:2015, Figure 1)
- Figure 4 – Example of the content of a non-technical preliminary study –(IEC TS 62257-2:2015, Figure 1)
- Figure 5 – TN-C-S system – (IEC TS 62257-5:2015, Figure B.2)
- Figure 6 – Phase A battery endurance test – (IEC TS 62257-8-1:2007, Figure 2)
- Figure 7 – Test 3, operating cycles – (IEC TS 62257-9-6:2008, Figure 3)
- Tables [Go to Page]
- Table 1 – Some advantages and disadvantages of the proposed single and multiple user systems
- Table 2 – Contents of the 62257 series
- Table 3 – Utilization of the different parts of the IEC 62257 series according to the main project phases
- Table 4 – Combined categorization – (IEC TS 62257-2:2015, Table C.1)
- Table 5 – Service specification (example) – (IEC TS 62257-2:2015, Table C.2)
- Table 6 – Verification of the adherence to commitments – (IEC TS 62257-6:2015, Table 8)
- Table 7 – AOMR participant involvement – (IEC TS 62257-6:2015, Table 3) [Go to Page]