Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

PD IEC/TS 62257-12-1:2015 - TC Tracked Changes. Recommendations for renewable energy and hybrid systems for rural electrification - Selection of lamps and lighting appliances for off-grid electricity systems, 2020
- 30321111_New.pdf [Go to Page]
- 30321110-VOR.pdf [Go to Page]
- CONTENTS
- FOREWORD
- INTRODUCTION
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Characteristics of lamps and lighting appliances [Go to Page]
- 4.1 Product categories
- 4.2 System measurements and observations [Go to Page]
- 4.2.1 General
- 4.2.2 Design, manufacture, and marketing
- 4.2.3 Durability and workmanship
- 4.2.4 Electrical characteristics
- 4.2.5 Photometric performance measures
- 4.2.6 Photometric durability measures
- 4.2.7 Self-declaration aspects
- 5 Product specification [Go to Page]
- 5.1 General
- 5.2 Applications
- 5.3 Quality assurance principles [Go to Page]
- 5.3.1 General
- 5.3.2 Rationale for dividing quality, warranty, and performance
- 5.4 Product specification framework description [Go to Page]
- 5.4.1 General
- 5.4.2 Product specification template
- 5.4.3 Tolerances
- 5.4.4 Quality standards criteria
- 5.4.5 Warranty requirements criteria
- 5.4.6 Performance criteria
- 6 Quality test method (QTM) [Go to Page]
- 6.1 General
- 6.2 Applications
- 6.3 Sampling requirements
- 6.4 Laboratory requirements
- 6.5 Testing requirements
- 6.6 Recommended test programme [Go to Page]
- 6.6.1 General
- 6.6.2 Reporting
- 7 Market check method (MCM) [Go to Page]
- 7.1 General
- 7.2 Applications
- 7.3 Sampling requirements
- 7.4 Laboratory requirements
- 7.5 Testing requirements
- 7.6 Recommended tests programme
- 7.7 Report requirements
- Annexes [Go to Page]
- Annex A (informative) Example quality standards and performance criteria for off-grid lighting market support programme qualification [Go to Page]
- A.1 Overview
- A.2 Test requirements
- A.3 Quality standards
- A.4 Warranty requirements
- A.5 Performance criteria
- Annex B (informative) Example quality standards, warranty requirements, and performance criteria for bulk procurement qualification (“sample tender”) [Go to Page]
- B.1 Overview
- B.2 Test requirements
- B.3 Product category requirements
- B.4 Quality standards
- B.5 Warranty requirements
- B.6 Performance criteria
- B.7 Performance criteria tolerance
- Annex C (normative) Manufacturer self-reported information [Go to Page]
- C.1 Background
- C.2 Outcomes
- C.3 Solicited information
- Annex D (normative) Product sampling [Go to Page]
- D.1 Background
- D.2 Test outcomes
- D.3 Related tests
- D.4 Procedure
- Annex E (normative) Power supply requirements for testing [Go to Page]
- E.1 Background
- E.2 Related tests
- E.3 Equipment requirements [Go to Page]
- E.3.1 DC systems
- E.3.2 AC systems
- E.4 Reporting
- Annex F (normative) Visual screening [Go to Page]
- F.1 Background
- F.2 Test outcomes
- F.3 Related tests
- F.4 Procedure [Go to Page]
- F.4.1 Properties, features, and information
- F.4.2 Specifications
- F.4.3 Functionality and internal inspection
- F.5 Reporting
- Annex G (normative) Sample preparation [Go to Page]
- G.1 Background
- G.2 Test outcomes
- G.3 Related tests
- G.4 Procedure [Go to Page]
- G.4.1 General
- G.4.2 Equipment requirements
- G.4.3 Test prerequisites
- G.4.4 Procedure
- G.5 Calculations
- G.6 Reporting
- Annex H (normative) Voltage and frequency settings, voltage measurement points, and product stabilization procedures [Go to Page]
- H.1 Background
- H.2 Related tests
- H.3 Equipment requirements
- H.4 Procedure [Go to Page]
- H.4.1 Test setup
- H.4.2 Standard operating voltages
- H.4.3 Frequency selection
- H.4.4 Stabilization period
- H.5 Reporting
- Annex I (normative) Light output [Go to Page]
- I.1 Background
- I.2 Test outcomes
- I.3 Related tests
- I.4 Procedure
- I.5 Calculations
- I.6 Reporting
- Annex J (normative) Light distribution [Go to Page]
- J.1 Background
- J.2 Test outcomes
- J.3 Related tests
- J.4 Procedure
- J.5 Calculations
- J.6 Reporting
- Annex K (normative) Input voltage range [Go to Page]
- K.1 Background
- K.2 Test outcomes
- K.3 Related tests
- K.4 Procedure [Go to Page]
- K.4.1 General
- K.4.2 Equipment requirements
- K.4.3 Test prerequisites
- K.4.4 Apparatus
- K.4.5 Procedure
- K.5 Calculations
- K.6 Reporting
- Annex L (normative) Lumen maintenance [Go to Page]
- L.1 Background
- L.2 Test outcomes
- L.3 Related tests
- L.4 Procedure
- L.5 Calculations
- Annex M (normative) Cycling [Go to Page]
- M.1 Background
- M.2 Test outcomes
- M.3 Related tests
- M.4 Procedure [Go to Page]
- M.4.1 General
- M.4.2 Equipment requirements
- M.4.3 Test prerequisites
- M.4.4 Apparatus
- M.4.5 Procedure
- M.5 Calculations
- M.6 Reporting
- Annex N (normative) Mechanical durability [Go to Page]
- N.1 Background
- N.2 Test outcomes
- N.3 Related tests
- N.4 Procedures [Go to Page]
- N.4.1 General
- N.4.2 Shipping vibration test
- N.5 Reporting
- Annex O (normative) Physical ingress and water protection [Go to Page]
- O.1 Background
- O.2 Test outcomes
- O.3 Related tests
- O.4 Procedure
- O.5 Reporting
- Annex P (normative) Power consumption and power quality [Go to Page]
- P.1 Background
- P.2 Test outcomes
- P.3 Related tests
- P.4 Procedure [Go to Page]
- P.4.1 DC power
- P.4.2 AC power
- P.5 Reporting
- Bibliography
- Figures [Go to Page]
- Figure 1 – The three components of a product specification
- Figure 2 – Recommended sequence of testing for QTM
- Figure H.1 – Test configuration
- Figure M.1 – Plot of cycle life for 6 samples
- Figure P.1 – Test configuration for the AC power consumption and power quality test if an external power meter is used
- Tables [Go to Page]
- Table 1 – Applications of product specifications
- Table 2 – Truth-in-advertising tolerance
- Table 3 – Safety and durability standards
- Table 4 – Power quality standards for AC products
- Table 5 – End-user support standards
- Table 6 – End-user support requirements
- Table 7 – Lighting service criteria for performance assessment
- Table 8 – Truth-in-advertising criteria for quality standards
- Table 9 – Notes on common truth-in-advertising aspects
- Table 10 – Safety and durability criteria for quality standards
- Table 11 – Recommended level of water protection by product category
- Table 12 – Power quality criteria for quality standards
- Table 13 – End-user support criteria for quality standards
- Table 14 – Criteria for warranty standards
- Table 15 – Lighting service criteria for performance assessment
- Table 16 – Lighting service benchmarks
- Table 17 – Applications of product specifications
- Table 18 – QTM testing requirements
- Table 19 – Applications of MCM results
- Table 20 – MCM testing requirements
- Table A.1 – Truth-in-advertising tolerance
- Table A.2 – Safety and durability standards
- Table A.3 – Power quality standards for AC products
- Table A.4 – End-user support requirements
- Table B.1 – Truth-in-advertising tolerance
- Table B.2 – Safety and durability standards
- Table B.3 – Power quality standards for AC products
- Table B.4 – End-user support requirements
- Table B.5 – Lighting service criteria for performance assessment
- Table C.1 – Manufacturer self-reported information outcomes
- Table D.1 – Product sampling outcomes
- Table F.1 – Visual screening test outcomes
- Table H.1 – Standard operating voltage for several nominal system voltages
- Table H.2 – Voltage and current reporting requirements
- Table I.1 – Light output test outcomes
- Table J.1 – Light distribution test outcomes
- Table K.1 – Input voltage range test outcomes
- Table K.2 – Recommended operating voltage range and maximum allowable voltage by nominal operating voltage
- Table K.3 – Example table of operating voltage, current, voltage at DUT, and relative light output
- Table L.1 – Lumen maintenance test outcomes
- Table M.1 – Cycling test outcomes
- Table N.1 – Mechanical durability test outcomes
- Table O.1 – Water exposure and physical ingress protection test outcomes
- Table P.1 – AC power quality test outcomes [Go to Page]