PD IEC/TS 61400-26-3:2016 Wind energy generation systems - Availability for wind power stations, 2016
- 30334388-VOR.pdf [Go to Page]
- CONTENTS
- FOREWORD
- INTRODUCTION
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations [Go to Page]
- 3.1 Terms and definitions
- 3.2 Abbreviations for ‘Information available’
- 3.3 Abbreviations for ‘Information unavailable’
- 4 Information model for WPS [Go to Page]
- 4.1 General
- 4.2 Services
- 4.3 Information category priority
- 4.4 Information model for BOP
- 5 INFORMATION AVAILABLE (WPS) [Go to Page]
- 5.1 General
- 5.2 OPERATIVE
- 5.3 IN SERVICE
- 5.4 OUT OF SERVICE
- 5.5 NON-OPERATIVE
- 5.6 FORCE MAJEURE
- 6 INFORMATION UNAVAILABLE (WPS)
- Annexes [Go to Page]
- Annex A (informative) Entry and Exit condition overview
- Annex B (informative) Application scenarios – examples [Go to Page]
- B.1 Overview
- B.2 Application scenarios [Go to Page]
- B.2.1 Example 1: Normal operation – all WPS
- B.2.2 Example 2: Normal operation – part of WPS
- B.2.3 Example 3: Dirty WTGSs blades – all WPS
- B.2.4 Example 4: Dirty WTGSs blades – part of WPS
- B.2.5 Example 5: BOP limitations – all WPS
- B.2.6 Example 6: BOP limitations – part of WPS
- B.2.7 Example 7: ‘Spinning reserve’ – all WPS
- B.2.8 Example 8: ‘Spinning reserve’ – part of WPS
- B.2.9 Example 9: Noise restrictions – Warranty related
- B.2.10 Example 10: Noise restrictions – environmentally related
- B.2.11 Example 11: Ice storm on Grid – all WPS
- Annex C (informative) Balance of plant integration [Go to Page]
- C.1 WPS functions and services
- C.2 Externally required functions and services
- C.3 Internally required functions and services
- C.4 Expansion of the Information Model for BOP functions and services
- Annex D (informative) Determination of potential production for a WPS – examples [Go to Page]
- D.1 Overview
- D.2 Primary service
- D.3 Secondary services
- Annex E (informative) Service availability indicators – examples [Go to Page]
- E.1 Overview
- E.2 Time based WPS availability [Go to Page]
- E.2.1 General
- E.2.2 Operational service availability (“TSO’s view”)
- E.2.3 Operational service availability (“WPS operator’s view”)
- E.2.4 Technical service availability (“WPS maintenance provider’s view”)
- E.3 Production-based service availability indicators – examples [Go to Page]
- E.3.1 Overview
- E.3.2 System operational production-based availability (“WPS operator’s view”)
- E.3.3 System operational production-based availability (“TSO’s view”)
- E.3.4 System operational production-based availability (“WPS maintenance provider’s view”)
- Annex F (informative) Examples of optional level 5 categories [Go to Page]
- F.1 Overview
- F.2 Example of level 5 definitions [Go to Page]
- F.2.1 General
- F.2.2 NOT CURTAILED
- F.2.3 NOT CURTAILED – WARNING
- F.2.4 UP-RATED
- F.2.5 DERATED – OTHER
- F.2.6 DERATED – GRID WPS OPERATOR
- F.2.7 DERATED – GRID TSO
- F.2.8 DERATED – GRID CONTROL
- F.2.9 DERATED – NOISE
- F.2.10 DERATED – TEMPERATURE
- F.2.11 DERATED – STRUCTURAL LOAD
- F.2.12 DERATED – WIND
- F.2.13 DEGRADED – OTHER
- F.2.14 DEGRADED – DIAGNOSTIC
- F.2.15 DEGRADED – NOISE
- F.2.16 DEGRADED – COMPONENT
- F.2.17 DEGRADED – TEMPERATURE
- F.2.18 DEGRADED – STRUCTURAL LOAD
- F.2.19 OTHER READY STANDBY
- F.2.20 OTHER TECHNICAL STANDBY
- F.2.21 LUBRICATION
- F.2.22 DE-ICING
- F.2.23 DRY OUT
- F.2.24 CABLE UNTWIST
- F.2.25 OTHER ENVIRONMENTAL
- F.2.26 CALM WINDS
- F.2.27 HIGH WIND
- F.2.28 TEMPERATURE
- F.2.29 OTHER REQUESTED SHUTDOWN
- F.2.30 ENVIRONMENTAL
- F.2.31 GRID – WPS OPERATOR
- F.2.32 GRID – TSO
- F.2.33 NOISE
- F.2.34 FLICKER
- F.2.35 WILDLIFE
- F.2.36 STRUCTURAL LOAD
- F.2.37 OTHER OUT OF ELECTRICAL SPECIFICATION
- F.2.38 FREQUENCY
- F.2.39 VOLTAGE LEVEL LOW
- F.2.40 VOLTAGE LEVEL HIGH
- F.2.41 ASYMMETRY
- F.2.42 SCHEDULED MAINTENANCE
- F.2.43 OTHER CORRECTIVE ACTION
- F.2.44 UPGRADE
- F.2.45 INSPECTIONS
- F.2.46 RETROFIT
- F.2.47 REPAIR WORK
- F.2.48 OTHER FORCED OUTAGE
- F.2.49 FAILURE REPAIR
- F.2.50 DIAGNOSTIC
- F.2.51 LOGISTIC WPS MAINTENANCE PROVIDER
- F.2.52 LOGISTIC WPS OPERATOR
- F.2.53 RESPONSE WPS MAINTENANCE PROVIDER
- F.2.54 RESPONSE WPS OPERATOR
- F.2.55 OTHER SUSPENDED – SCHEDULED MAINTENANCE
- F.2.56 PERSONNEL SAFETY – SCHEDULED MAINTENANCE
- F.2.57 ENVIRONMENT – SCHEDULED MAINTENANCE
- F.2.58 IT ACCESS – SCHEDULED MAINTENANCE
- F.2.59 OTHER SUSPENDED – PLANNED CORRECTIVE ACTION
- F.2.60 PERSONNEL SAFETY – PLANNED CORRECTIVE ACTION
- F.2.61 ENVIRONMENT – PLANNED CORRECTIVE ACTION
- F.2.62 IT ACCESS – PLANNED CORRECTIVE ACTION
- F.2.63 OTHER SUSPENDED – FORCED OUTAGE
- F.2.64 PERSONNEL SAFETY – FORCED OUTAGE
- F.2.65 ENVIRONMENT – FORCED OUTAGE
- F.2.66 IT ACCESS – FORCED OUTAGE
- F.2.67 INACTIVE RESERVE
- F.2.68 MOTHBALLED
- F.2.69 RETIRED
- F.2.70 FORCE MAJEURE
- F.2.71 INFORMATION UNAVAILABLE
- Bibliography
- Figures [Go to Page]
- Figure 1 – Data stakeholders for a wind power station
- Figure 2 – Information category overview for a WPS
- Figure 3 – Example of a model split-up in active power, reactive power high and low frequency compensation services
- Figure 4 – Information category priority for WPS
- Figure 5 – Mandatory INFORMATION AVAILABLE categories for WPS
- Figure 6 – OPERATIVE category
- Figure 7 – IN SERVICE category
- Figure 8 – FULL PERFORMANCE category
- Figure 9 – PARTIAL PERFORMANCE category
- Figure 10 – READY STANDBY category
- Figure 11 – OUT OF SERVICE category
- Figure 12 – TECHNICAL STANDBY category
- Figure 13 – OUT OF ENVIRONMENTAL SPECIFICATION category
- Figure 14 – REQUESTED SHUTDOWN category
- Figure 15 – OUT OF ELECTRICAL SPECIFICATION category
- Figure 16 – NON-OPERATIVE category
- Figure 17 – SCHEDULED MAINTENANCE category
- Figure 18 – PLANNED CORRECTIVE ACTION category
- Figure 19 – FORCED OUTAGE category
- Figure 20 – SUSPENDED category
- Figure 21 – FORCE MAJEURE category
- Figure 22 – INFORMATION UNAVAILABLE category
- Figure A.1 – Overview of the entry and exit conditions of all mandatory information categories described in this document
- Tables [Go to Page]
- Table B.1 – Scenario, Example 1: Normal operation – all WPS
- Table B.2 – Scenario, Example 2: Normal operation – part of WPS
- Table B.3 – Scenario, Example 3: Dirty WTGSs blades – all WPS
- Table B.4 – Scenario, Example 4: Dirty WTGSs blades – part of WPS
- Table B.5 – Scenario, Example 5: BOP limitations – all WPS
- Table B.6 – Scenario, Example 6: BOP limitations – part of WPS
- Table B.7 – Scenario, Example 7: ‘Spinning reserve’ – all WPS
- Table B.8 – Scenario, Example 8: ‘Spinning reserve’ – part of WPS
- Table B.9 – Scenario, Example 9: Noise restrictions – all WPS
- Table B.10 – Scenario, Example 10: Noise restrictions – all WPS
- Table B.11 – Scenario, Example 11: Ice storm on Grid – all WPS
- Table D.1 – Examples on how to determine Potential production
- Table F.1 – Example of level 5 definitions
- Table F.2 – NOT CURTAILED category
- Table F.3 – NOT CURTAILED – WARNING category
- Table F.4 – UP-RATED category
- Table F.5 – DERATED – OTHER category
- Table F.6 – DERATED – GRID WPS OPERATOR category
- Table F.7 – DERATED – GRID TSO category
- Table F.8 – DERATED – GRID CONTROL category
- Table F.9 – DERATED – NOISE category
- Table F.10 – DERATED – TEMPERATURE category
- Table F.11 – DERATED – STRUCTURAL LOAD category
- Table F.12 – DERATED – WIND category
- Table F.13 – DEGRADED – OTHER category
- Table F.14 – DEGRADED – DIAGNOSTIC category
- Table F.15 – DEGRADED – NOISE category
- Table F.16 – DEGRADED – COMPONENT category
- Table F.17 – DEGRADED – TEMPERATURE category
- Table F.18 – DEGRADED – STRUCTURAL LOAD category
- Table F.19 – OTHER READY STANDBY category
- Table F.20 – OTHER TECHNICAL STANDBY category
- Table F.21 – LUBRICATION category
- Table F.22 – DE-ICING category
- Table F.23 – DRY OUT category
- Table F.24 – CABLE UNTWIST category
- Table F.25 – OTHER ENVIRONMENTAL category
- Table F.26 – CALM WINDS category
- Table F.27 – HIGH WIND category
- Table F.28 – TEMPERATURE category
- Table F.29 – OTHER REQUESTED SHUTDOWN category
- Table F.30 – ENVIRONMENTAL category
- Table F.31 – GRID – WPS OPERATOR category
- Table F.32 – GRID – TSO category
- Table F.33 – NOISE category
- Table F.34 – FLICKER category
- Table F.35 – WILDLIFE category
- Table F.36 – STRUCTURAL LOAD category
- Table F.37 – OTHER OUT OF ELECTRICAL SPECIFICATION category
- Table F.38 – FREQUENCY category
- Table F.39 – VOLTAGE LEVEL LOW category
- Table F.40 – VOLTAGE LEVEL HIGH category
- Table F.41 – ASYMMETRY category
- Table F.42 – SCHEDULED MAINTENANCE category
- Table F.43 – OTHER CORRECTIVE ACTION category
- Table F.44 – UPGRADE category
- Table F.45 – INSPECTIONS category
- Table F.46 – RETROFIT category
- Table F.47 – REPAIR WORK category
- Table F.48 – OTHER FORCED OUTAGE category
- Table F.49 – FAILURE REPAIR category
- Table F.50 – DIAGNOSTIC category
- Table F.51 – LOGISTIC WPS MAINTENANCE PROVIDER category
- Table F.52 – LOGISTIC WPS OPERATOR category
- Table F.53 – RESPONSE WPS MAINTENANCE PROVIDER category
- Table F.54 – RESPONSE WPS OPERATOR category
- Table F.55 – OTHER SUSPENDED – SCHEDULED MAINTENANCE category
- Table F.56 – PERSONNEL SAFETY – SCHEDULED MAINTENANCE category
- Table F.57 – ENVIRONMENT – SCHEDULED MAINTENANCE category
- Table F.58 – IT ACCESS – SCHEDULED MAINTENANCE category
- Table F.59 – OTHER SUSPENDED – PLANNED CORRECTIVE ACTION category
- Table F.60 – PERSONNEL SAFETY – PLANNED CORRECTIVE ACTION category
- Table F.61 – ENVIRONMENT – PLANNED CORRECTIVE ACTION category
- Table F.62 – IT ACCESS – PLANNED CORRECTIVE ACTION category
- Table F.63 – OTHER SUSPENDED – FORCED OUTAGE category
- Table F.64 – PERSONNEL SAFETY – FORCED OUTAGE category
- Table F.65 – ENVIRONMENT – FORCED OUTAGE category
- Table F.66 – IT ACCESS – FORCED OUTAGE category
- Table F.67 – INACTIVE RESERVE category
- Table F.68 – MOTHBALLED category
- Table F.69 – RETIRED category
- Table F.70 – FORCE MAJEURE category
- Table F.71 – INFORMATION UNAVAILABLE category [Go to Page]