Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
PD CLC/TS 61400-26-3:2017 Wind energy generation systems - Availability for wind power stations, 2017
- National foreword
- Annex ZA(normative)Normative references to international publicationswith their corresponding European publications
- CONTENTS
- FOREWORD
- INTRODUCTION
- Figures [Go to Page]
- Figure 1 – Data stakeholders for a wind power station
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations [Go to Page]
- 3.1 Terms and definitions
- 3.2 Abbreviations for ‘Information available’
- 3.3 Abbreviations for ‘Information unavailable’
- 4 Information model for WPS [Go to Page]
- 4.1 General
- Figure 2 – Information category overview for a WPS
- 4.2 Services
- Figure 3 – Example of a model split-up in active power, reactive power high and low frequency compensation services
- 4.3 Information category priority
- 4.4 Information model for BOP
- Figure 4 – Information category priority for WPS
- 5 INFORMATION AVAILABLE (WPS) [Go to Page]
- 5.1 General
- 5.2 OPERATIVE
- Figure 5 – Mandatory INFORMATION AVAILABLE categories for WPS
- 5.3 IN SERVICE
- Figure 6 – OPERATIVE category
- Figure 7 – IN SERVICE category
- Figure 8 – FULL PERFORMANCE category
- Figure 9 – PARTIAL PERFORMANCE category
- 5.4 OUT OF SERVICE
- Figure 10 – READY STANDBY category
- Figure 11 – OUT OF SERVICE category
- Figure 12 – TECHNICAL STANDBY category
- Figure 13 – OUT OF ENVIRONMENTAL SPECIFICATION category
- Figure 14 – REQUESTED SHUTDOWN category
- 5.5 NON-OPERATIVE
- Figure 15 – OUT OF ELECTRICAL SPECIFICATION category
- Figure 16 – NON-OPERATIVE category
- Figure 17 – SCHEDULED MAINTENANCE category
- Figure 18 – PLANNED CORRECTIVE ACTION category
- Figure 19 – FORCED OUTAGE category
- 5.6 FORCE MAJEURE
- Figure 20 – SUSPENDED category
- 6 INFORMATION UNAVAILABLE (WPS) [Go to Page]
- Figure 21 – FORCE MAJEURE category
- Figure 22 – INFORMATION UNAVAILABLE category
- Annexes [Go to Page]
- Annex A (informative) Entry and Exit condition overview
- Figure A.1 – Overview of the entry and exit conditions of all mandatory information categories described in this document
- Annex B (informative) Application scenarios – examples [Go to Page]
- B.1 Overview
- B.2 Application scenarios [Go to Page]
- B.2.1 Example 1: Normal operation – all WPS
- B.2.2 Example 2: Normal operation – part of WPS
- B.2.3 Example 3: Dirty WTGSs blades – all WPS
- B.2.4 Example 4: Dirty WTGSs blades – part of WPS
- B.2.5 Example 5: BOP limitations – all WPS
- B.2.6 Example 6: BOP limitations – part of WPS
- B.2.7 Example 7: ‘Spinning reserve’ – all WPS
- B.2.8 Example 8: ‘Spinning reserve’ – part of WPS
- B.2.9 Example 9: Noise restrictions – Warranty related
- B.2.10 Example 10: Noise restrictions – environmentally related
- B.2.11 Example 11: Ice storm on Grid – all WPS
- Tables [Go to Page]
- Table B.1 – Scenario, Example 1: Normal operation – all WPS
- Table B.2 – Scenario, Example 2: Normal operation – part of WPS
- Table B.3 – Scenario, Example 3: Dirty WTGSs blades – all WPS
- Table B.4 – Scenario, Example 4: Dirty WTGSs blades – part of WPS
- Table B.5 – Scenario, Example 5: BOP limitations – all WPS
- Table B.6 – Scenario, Example 6: BOP limitations – part of WPS
- Table B.7 – Scenario, Example 7: ‘Spinning reserve’ – all WPS
- Table B.8 – Scenario, Example 8: ‘Spinning reserve’ – part of WPS
- Table B.9 – Scenario, Example 9: Noise restrictions – all WPS
- Table B.10 – Scenario, Example 10: Noise restrictions – all WPS
- Table B.11 – Scenario, Example 11: Ice storm on Grid – all WPS
- Annex C (informative) Balance of plant integration [Go to Page]
- C.1 WPS functions and services
- C.2 Externally required functions and services
- C.3 Internally required functions and services
- C.4 Expansion of the Information Model for BOP functions and services
- Annex D (informative) Determination of potential production for a WPS – examples [Go to Page]
- D.1 Overview
- D.2 Primary service
- D.3 Secondary services
- Table D.1 – Examples on how to determine Potential production
- Annex E (informative) Service availability indicators – examples [Go to Page]
- E.1 Overview
- E.2 Time based WPS availability [Go to Page]
- E.2.1 General
- E.2.2 Operational service availability (“TSO’s view”)
- E.2.3 Operational service availability (“WPS operator’s view”)
- E.2.4 Technical service availability (“WPS maintenance provider’s view”)
- E.3 Production-based service availability indicators – examples [Go to Page]
- E.3.1 Overview
- E.3.2 System operational production-based availability (“WPS operator’s view”)
- E.3.3 System operational production-based availability (“TSO’s view”)
- E.3.4 System operational production-based availability (“WPS maintenance provider’s view”)
- Annex F (informative) Examples of optional level 5 categories [Go to Page]
- F.1 Overview
- F.2 Example of level 5 definitions [Go to Page]
- F.2.1 General
- F.2.2 NOT CURTAILED
- F.2.3 NOT CURTAILED – WARNING
- F.2.4 UP-RATED
- F.2.5 DERATED – OTHER
- F.2.6 DERATED – GRID WPS OPERATOR
- F.2.7 DERATED – GRID TSO
- F.2.8 DERATED – GRID CONTROL
- F.2.9 DERATED – NOISE
- F.2.10 DERATED – TEMPERATURE
- F.2.11 DERATED – STRUCTURAL LOAD
- F.2.12 DERATED – WIND
- F.2.13 DEGRADED – OTHER
- F.2.14 DEGRADED – DIAGNOSTIC
- F.2.15 DEGRADED – NOISE
- F.2.16 DEGRADED – COMPONENT
- F.2.17 DEGRADED – TEMPERATURE
- F.2.18 DEGRADED – STRUCTURAL LOAD
- F.2.19 OTHER READY STANDBY
- F.2.20 OTHER TECHNICAL STANDBY
- F.2.21 LUBRICATION
- F.2.22 DE-ICING
- F.2.23 DRY OUT
- F.2.24 CABLE UNTWIST
- F.2.25 OTHER ENVIRONMENTAL
- F.2.26 CALM WINDS
- F.2.27 HIGH WIND
- F.2.28 TEMPERATURE
- F.2.29 OTHER REQUESTED SHUTDOWN
- F.2.30 ENVIRONMENTAL
- F.2.31 GRID – WPS OPERATOR
- F.2.32 GRID – TSO
- F.2.33 NOISE
- F.2.34 FLICKER
- F.2.35 WILDLIFE
- F.2.36 STRUCTURAL LOAD
- F.2.37 OTHER OUT OF ELECTRICAL SPECIFICATION
- F.2.38 FREQUENCY
- F.2.39 VOLTAGE LEVEL LOW
- F.2.40 VOLTAGE LEVEL HIGH
- F.2.41 ASYMMETRY
- F.2.42 SCHEDULED MAINTENANCE
- F.2.43 OTHER CORRECTIVE ACTION
- F.2.44 UPGRADE
- F.2.45 INSPECTIONS
- F.2.46 RETROFIT
- F.2.47 REPAIR WORK
- F.2.48 OTHER FORCED OUTAGE
- F.2.49 FAILURE REPAIR
- F.2.50 DIAGNOSTIC
- F.2.51 LOGISTIC WPS MAINTENANCE PROVIDER
- F.2.52 LOGISTIC WPS OPERATOR
- F.2.53 RESPONSE WPS MAINTENANCE PROVIDER
- F.2.54 RESPONSE WPS OPERATOR
- F.2.55 OTHER SUSPENDED – SCHEDULED MAINTENANCE
- F.2.56 PERSONNEL SAFETY – SCHEDULED MAINTENANCE
- F.2.57 ENVIRONMENT – SCHEDULED MAINTENANCE
- F.2.58 IT ACCESS – SCHEDULED MAINTENANCE
- F.2.59 OTHER SUSPENDED – PLANNED CORRECTIVE ACTION
- F.2.60 PERSONNEL SAFETY – PLANNED CORRECTIVE ACTION
- F.2.61 ENVIRONMENT – PLANNED CORRECTIVE ACTION
- F.2.62 IT ACCESS – PLANNED CORRECTIVE ACTION
- F.2.63 OTHER SUSPENDED – FORCED OUTAGE
- F.2.64 PERSONNEL SAFETY – FORCED OUTAGE
- F.2.65 ENVIRONMENT – FORCED OUTAGE
- F.2.66 IT ACCESS – FORCED OUTAGE
- F.2.67 INACTIVE RESERVE
- F.2.68 MOTHBALLED
- F.2.69 RETIRED
- F.2.70 FORCE MAJEURE
- F.2.71 INFORMATION UNAVAILABLE
- Table F.1 – Example of level 5 definitions
- Table F.2 – NOT CURTAILED category
- Table F.3 – NOT CURTAILED – WARNING category
- Table F.4 – UP-RATED category
- Table F.5 – DERATED – OTHER category
- Table F.6 – DERATED – GRID WPS OPERATOR category
- Table F.7 – DERATED – GRID TSO category
- Table F.8 – DERATED – GRID CONTROL category
- Table F.9 – DERATED – NOISE category
- Table F.10 – DERATED – TEMPERATURE category
- Table F.11 – DERATED – STRUCTURAL LOAD category
- Table F.12 – DERATED – WIND category
- Table F.13 – DEGRADED – OTHER category
- Table F.14 – DEGRADED – DIAGNOSTIC category
- Table F.15 – DEGRADED – NOISE category
- Table F.16 – DEGRADED – COMPONENT category
- Table F.17 – DEGRADED – TEMPERATURE category
- Table F.18 – DEGRADED – STRUCTURAL LOAD category
- Table F.19 – OTHER READY STANDBY category
- Table F.20 – OTHER TECHNICAL STANDBY category
- Table F.21 – LUBRICATION category
- Table F.22 – DE-ICING category
- Table F.23 – DRY OUT category
- Table F.24 – CABLE UNTWIST category
- Table F.25 – OTHER ENVIRONMENTAL category
- Table F.26 – CALM WINDS category
- Table F.27 – HIGH WIND category
- Table F.28 – TEMPERATURE category
- Table F.29 – OTHER REQUESTED SHUTDOWN category
- Table F.30 – ENVIRONMENTAL category
- Table F.31 – GRID – WPS OPERATOR category
- Table F.32 – GRID – TSO category
- Table F.33 – NOISE category
- Table F.34 – FLICKER category
- Table F.35 – WILDLIFE category
- Table F.36 – STRUCTURAL LOAD category
- Table F.37 – OTHER OUT OF ELECTRICAL SPECIFICATION category
- Table F.38 – FREQUENCY category
- Table F.39 – VOLTAGE LEVEL LOW category
- Table F.40 – VOLTAGE LEVEL HIGH category
- Table F.41 – ASYMMETRY category
- Table F.42 – SCHEDULED MAINTENANCE category
- Table F.43 – OTHER CORRECTIVE ACTION category
- Table F.44 – UPGRADE category
- Table F.45 – INSPECTIONS category
- Table F.46 – RETROFIT category
- Table F.47 – REPAIR WORK category
- Table F.48 – OTHER FORCED OUTAGE category
- Table F.49 – FAILURE REPAIR category
- Table F.50 – DIAGNOSTIC category
- Table F.51 – LOGISTIC WPS MAINTENANCE PROVIDER category
- Table F.52 – LOGISTIC WPS OPERATOR category
- Table F.53 – RESPONSE WPS MAINTENANCE PROVIDER category
- Table F.54 – RESPONSE WPS OPERATOR category
- Table F.55 – OTHER SUSPENDED – SCHEDULED MAINTENANCE category
- Table F.56 – PERSONNEL SAFETY – SCHEDULED MAINTENANCE category
- Table F.57 – ENVIRONMENT – SCHEDULED MAINTENANCE category
- Table F.58 – IT ACCESS – SCHEDULED MAINTENANCE category
- Table F.59 – OTHER SUSPENDED – PLANNED CORRECTIVE ACTION category
- Table F.60 – PERSONNEL SAFETY – PLANNED CORRECTIVE ACTION category
- Table F.61 – ENVIRONMENT – PLANNED CORRECTIVE ACTION category
- Table F.62 – IT ACCESS – PLANNED CORRECTIVE ACTION category
- Table F.63 – OTHER SUSPENDED – FORCED OUTAGE category
- Table F.64 – PERSONNEL SAFETY – FORCED OUTAGE category
- Table F.65 – ENVIRONMENT – FORCED OUTAGE category
- Table F.66 – IT ACCESS – FORCED OUTAGE category
- Table F.67 – INACTIVE RESERVE category
- Table F.68 – MOTHBALLED category
- Table F.69 – RETIRED category
- Table F.70 – FORCE MAJEURE category
- Table F.71 – INFORMATION UNAVAILABLE category
- Bibliography [Go to Page]