Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS ISO 4917-6:2024 Design of nuclear power plants against seismic events - Post-seismic measures, 2024
- undefined
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Procedure [Go to Page]
- 4.1 General requirements
- 4.2 Verification of the earthquake
- 4.3 Classification of the earthquake
- 4.4 Initial measures [Go to Page]
- 4.4.1 Plant check-up from the control room and plant walk-down inspection (Figure 2, chart item 3)
- 4.4.2 Deviations caused by the earthquake (Figure 2, chart item 4)
- 4.4.3 Specified normal operation condition in accordance with the operating manual (Figure 2, chart item 5)
- 4.5 In-depth measures [Go to Page]
- 4.5.1 General
- 4.5.2 Special/Seismic inspections and analyses (Figure 2, chart item 6)
- 4.5.3 Specified normal operation condition and permissible loads (Figure 2, chart item 7)
- 4.5.4 Shutdown inspection (Figure 2, chart item 9)
- 4.6 Resulting measures [Go to Page]
- 4.6.1 Continued operation (Figure 2, chart item 8)
- 4.6.2 Shutting down the plant (Figure 2, chart item 10)
- 4.6.3 Additional procedures (Figure 2, chart item 11)
- Annex A (informative) Derivation of factor, f
- Annex B (informative) Directives for plant walk-down inspections
- Annex C (informative) Special/Seismic inspections
- Bibliography [Go to Page]