Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN IEC 62364:2019 - TC Tracked Changes. Hydraulic machines. Guidelines for dealing with hydro-abrasive erosion in kaplan, francis, and pelton turbines, 2020
- 30338676_NEW.pdf [Go to Page]
- undefined
- English [Go to Page]
- CONTENTS
- FOREWORD
- INTRODUCTION
- 1 Scope
- 2 Terms, definitions and symbols
- 3 Prediction of hydro-abrasive erosion rate [Go to Page]
- 3.1 Model for hydro-abrasive erosion depth
- 3.2 Reference model
- Figure 1 – Estimation of the characteristic velocities in guide vanes, Wgv, and runner, Wrun, as a function of turbine specific speed
- Table 1 – Values of Kf and p for various components
- 3.3 Simplified hydro-abrasive erosion evaluation
- Figures
- Tables
- 4 Design [Go to Page]
- 4.1 General
- Figure 2 – Simplified evaluation of risk of hydro-abrasive erosion for first assessment
- 4.2 Selection of materials with high resistance to hydro-abrasive erosion and coating
- 4.3 Stainless steel overlays
- 4.4 Water conveyance system
- 4.5 Valve [Go to Page]
- 4.5.1 General
- 4.5.2 Protection (closing) of the gap between housing and trunnion
- 4.5.3 Stops located outside the valve
- Figure 3 – Example of protection of transition area [Go to Page]
- 4.5.4 Proper capacity of inlet valve operator
- 4.5.5 Increase bypass size to allow higher guide vane leakage
- 4.5.6 Bypass system design
- 4.6 Turbine [Go to Page]
- 4.6.1 General
- 4.6.2 Hydraulic design
- Figure 4 – Runner blade overhang in refurbishment project [Go to Page]
- 4.6.3 Mechanical design
- Figure 5 – Example of cavitation on runner band due to thicker blades
- Figure 6 – Example of design of guide vane trunnion seals
- Figure 7 – Example of fixing of facing plates from the dry side (bolt to the left)
- Figure 8 – Head cover balancing pipes with bends
- 5 Operation and maintenance [Go to Page]
- 5.1 Operation
- Figure 9 – Step labyrinth with optimized shape for hardcoating
- 5.2 Spares and regular inspections
- 5.3 Particle sampling and monitoring
- Figure 10 – Sample plot of particle concentration versus time
- 6 Materials with high resistance to hydro-abrasive erosion [Go to Page]
- 6.1 Guidelines concerning relative hydro-abrasive erosion resistance of materials including hydro-abrasive erosion resistant coatings [Go to Page]
- 6.1.1 General
- 6.1.2 Discussion and conclusions
- 6.2 Guidelines concerning maintainability of hydro-abrasive erosion resistant coating materials [Go to Page]
- 6.2.1 Definition of terms used in this subclause
- 6.2.2 Time between overhaul for protective coatings
- 6.2.3 Repair of protective coatings
- Table 2 – Overview over the feasibility for repair C on site
- 7 Guidelines on insertions into specifications [Go to Page]
- 7.1 General
- 7.2 Properties of particles going through the turbine
- Table 3 – Form for properties of particles going through the turbine
- 7.3 Size distribution of particles
- Table 4 – Form for size distribution of particles
- Annexes [Go to Page]
- Annex A (informative) PL calculation example
- Table A.1 – Example of documenting sample tests
- Table A.2 – Example of documenting sample results
- Annex B (informative) Measuring and recording hydro-abrasive erosion damages [Go to Page]
- B.1 Recording hydro-abrasive erosion damage
- B.2 Pelton runner without coating
- B.3 Needle tip and mouth piece without coating
- B.4 Pelton runner with hardcoating
- B.5 Needle tip, seat ring and nozzle housing with coating
- B.6 Francis runner and stationary labyrinth without coating
- B.7 Francis runner with coating and stationary labyrinth
- B.8 Guide vanes and facing plates without coating
- B.9 Guide vanes and facing plates with coating
- B.10 Stay vanes
- B.11 Francis labyrinth seals uncoated
- B.12 Kaplan uncoated
- B.13 Kaplan coated
- B.14 Sample data sheets
- B.15 Inspection record, runner blade inlet
- Table B.1 – Inspection record, runner blade inlet form [Go to Page]
- B.16 Inspection record, runner blade outlet
- Table B.2 – Inspection record, runner blade outlet form [Go to Page]
- B.17 Inspection record, runner band
- Table B.3 – Inspection record, runner band form [Go to Page]
- B.18 Inspection record, guide vanes
- Table B.4 – Inspection record, guide vanes form [Go to Page]
- B.19 Inspection record, facing plates and covers
- Table B.5 – Inspection record, facing plates and covers form [Go to Page]
- B.20 Inspection record, upper stationary seal
- Table B.6 – Inspection record, upper stationary seal form [Go to Page]
- B.21 Inspection record, upper rotating seal
- Table B.7 – Inspection record, upper rotating seal form [Go to Page]
- B.22 Inspection record, lower stationary seal
- Table B.8 – Inspection record, lower stationary seal form [Go to Page]
- B.23 Inspection record, lower rotating seal
- Table B.9 – Inspection record, lower rotating seal form [Go to Page]
- B.24 Inspection record, runner bucket
- Table B.10 – Inspection record, runner bucket [Go to Page]
- B.25 Inspection record, Pelton runner splitter
- Table B.11 – Inspection record, Pelton runner splitter
- Annex C (informative) Monitoring of particle concentration and properties and water sampling procedure [Go to Page]
- C.1 General
- C.2 Sampling before building a power station
- C.3 Sampling in existing power stations
- C.4 Logging of samples
- Annex D (informative) Procedures for analysis of particle concentration, size, hardness and shape [Go to Page]
- D.1 General
- D.2 Particle concentration
- D.3 Particle size distribution
- D.4 Mineralogical composition
- D.5 Particle geometry
- Figure D.1 – Typical examples of particle geometry
- Annex E (informative) Frequency of sediment sampling
- Annex F (informative) Typical criteria to determine overhaul time due to hydro-abrasive erosion [Go to Page]
- F.1 General
- F.2 Parameters which are observable while the unit is in operation
- F.3 Criteria that require internal inspection of the unit
- Annex G (informative) Example to calculate the hydro-abrasive erosion depth
- Table G.1 – Calculations
- Annex H (informative) Examples to calculate the TBO in the reference model
- Table H.1 – Pelton turbine calculation example
- Table H.2 – Francis turbine calculation example
- Annex I (informative) Background for hydro-abrasive erosion depth model [Go to Page]
- I.1 Model background and derivation
- I.2 Introduction to the PL variable
- Figure I.1 – Example of flow pattern in a Pelton injector at different load [Go to Page]
- I.3 Calibration of the formula
- Table I.1 – Analysis of the calibration constant Kf and p
- Annex J (informative) Quality control of thermal sprayed WC-CoCr [Go to Page]
- J.1 Specification
- J.2 Quality control
- Table J.1 – Recommended items to include in HVOF inspection
- Bibliography [Go to Page]