Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN 60539-1:2016 Directly heated negative temperature coefficient thermistors - Generic specification, 2018
- undefined
- European foreword
- Endorsement notice
- Annex ZA (normative) Normative references to international publications with their corresponding European publications
- English [Go to Page]
- CONTENTS
- FOREWORD
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- Figures [Go to Page]
- Figure 1 – Typical resistance-temperature characteristic for NTC thermistors
- Figure 2 – Decreased power dissipation curve
- Figure 3 – Maximum current derating
- 4 General items [Go to Page]
- 4.1 Units and symbols
- 4.2 Preferred values and appropriate category [Go to Page]
- 4.2.1 General
- 4.2.2 Appropriate category
- 4.3 Marking [Go to Page]
- 4.3.1 General
- Tables [Go to Page]
- Table 1 – Lower and upper category temperatures and duration of the damp heat, steady state test [Go to Page]
- 4.3.2 Marking for small size types such as surface mount thermistors
- 4.3.3 Coding
- 4.4 Quality assessment procedures
- 5 Test and measurement procedures [Go to Page]
- 5.1 General
- 5.2 Standard atmospheric conditions for testing
- 5.3 Drying and recovery [Go to Page]
- 5.3.1 Drying
- 5.3.2 Recovery
- 5.4 Mounting (for surface mount thermistors only) [Go to Page]
- 5.4.1 General
- 5.4.2 Substrate and pad
- 5.4.3 Mounting on board
- 5.5 Visual examination and check of dimensions [Go to Page]
- 5.5.1 Visual examination
- 5.5.2 Dimensions
- 5.6 Zero-power resistance [Go to Page]
- 5.6.1 General
- 5.6.2 Measurement procedures
- 5.6.3 Requirements
- Figure 4 – Basic circuit for zero-power resistance measurement
- 5.7 B-value or resistance ratio [Go to Page]
- 5.7.1 General
- 5.7.2 Requirements
- 5.8 Insulation resistance (for insulated types only) [Go to Page]
- 5.8.1 General
- 5.8.2 Test methods
- Figure 5 – Example of Method 1 for testing the insulation resistance
- Figure 6 – Example of Method 2 for testing the insulation resistance (1)
- Figure 7 – Example of Method 2 for testing the insulation resistance (2) [Go to Page]
- 5.8.3 Applied voltage
- Figure 8 – Example of Method 3 for testing the insulation resistance
- Figure 9 – Example of Method 4 for testing the insulation resistance [Go to Page]
- 5.8.4 Requirements
- 5.9 Voltage proof (for insulated types only) [Go to Page]
- 5.9.1 General
- 5.9.2 Test voltage
- 5.9.3 Requirements
- 5.10 Resistance/temperature characteristic [Go to Page]
- 5.10.1 General
- 5.10.2 Test methods
- 5.10.3 Requirements
- 5.11 Dissipation factor (δ) [Go to Page]
- 5.11.1 General
- 5.11.2 Initial measurements
- 5.11.3 Test methods
- Figure 10 – Example of test chamber [Go to Page]
- 5.11.4 Requirements
- 5.12 Thermal time constant by ambient temperature change (τa) [Go to Page]
- 5.12.1 The hot to cold thermal time constant for ambient temperature change
- Figure 11 – Dissipation factor measuring circuit [Go to Page]
- 5.12.2 The cold to hot thermal time constant for ambient temperature change
- 5.12.3 Final measurements and requirements
- 5.12.4 Requirements
- 5.13 Thermal time constant by cooling after self-heating (τc) [Go to Page]
- 5.13.1 General
- 5.13.2 Initial measurements
- 5.13.3 Preconditioning
- 5.13.4 Test method
- 5.13.5 Final measurements and requirements
- Figure 12 – Thermal time constant measuring circuit
- 5.14 Robustness of terminations (not applicable to surface mount thermistors) [Go to Page]
- 5.14.1 General
- 5.14.2 Initial measurements
- 5.14.3 Test methods
- 5.14.4 Test Ua1 – Tensile
- 5.14.5 Test Ub – Bending (half the number of terminations)
- 5.14.6 Test Uc – Torsion (remaining terminations)
- Table 2 – Tensile force [Go to Page]
- 5.14.7 Final measurements and requirements
- 5.15 Resistance to soldering heat [Go to Page]
- 5.15.1 General
- 5.15.2 Preconditioning
- 5.15.3 Test procedure
- 5.15.4 Recovery
- 5.15.5 Final inspection, measurement and requirements
- 5.16 Solderability [Go to Page]
- 5.16.1 General
- 5.16.2 Test procedure
- 5.16.3 Final inspection, measurements and requirements
- 5.17 Rapid change of temperature [Go to Page]
- 5.17.1 General
- 5.17.2 Initial measurements
- 5.17.3 Test procedures
- 5.17.4 Final inspection, measurements and requirements
- 5.18 Vibration [Go to Page]
- 5.18.1 General
- 5.18.2 Initial measurements
- 5.18.3 Test procedures
- 5.18.4 Final inspection, measurements and requirements
- 5.19 Shock [Go to Page]
- 5.19.1 General
- 5.19.2 Initial measurements
- 5.19.3 Mounting
- 5.19.4 Test procedures
- 5.19.5 Final inspection, measurements and requirements
- 5.20 Free fall [Go to Page]
- 5.20.1 General
- 5.20.2 Initial measurements
- 5.20.3 Test procedures
- 5.20.4 Final inspection, measurements and requirements
- 5.21 Thermal shock [Go to Page]
- 5.21.1 General
- 5.21.2 Initial measurements
- 5.21.3 Test procedures
- 5.21.4 Final inspection, measurements and requirements
- 5.22 Cold [Go to Page]
- 5.22.1 General
- 5.22.2 Initial measurements
- 5.22.3 Test procedures
- 5.22.4 Final inspection, measurements and requirements
- 5.23 Dry heat [Go to Page]
- 5.23.1 General
- 5.23.2 Initial measurements
- 5.23.3 Test procedures
- 5.23.4 Final inspection, measurements and requirements
- 5.24 Damp heat, steady state [Go to Page]
- 5.24.1 General
- 5.24.2 Initial measurements
- 5.24.3 Test procedures
- 5.24.4 Recovery
- 5.24.5 Final inspection, measurements and requirements
- 5.25 Endurance [Go to Page]
- 5.25.1 General
- 5.25.2 Endurance at room temperature with applied continuous maximum current (Imax25) (for inrush current-limiting thermistors only)
- 5.25.3 Endurance at room temperature with applied cyclic maximum current (Imax25) (for inrush current-limiting thermistors only)
- Figure 13 – Endurance at room temperature with Imax25 evaluating circuit [Go to Page]
- 5.25.4 Endurance at T3 and Pmax
- 5.25.5 Endurance at upper category temperature
- 5.25.6 Maximum permissible capacitance (for inrush current-limiting thermistors only)
- Figure 14 – Maximum permissible capacitance test circuit (Method 1)
- 5.26 Shear (adhesion) test (for surface mount thermistors only) [Go to Page]
- 5.26.1 General
- Figure 15 – Maximum permissible capacitance test circuit (Method 2) [Go to Page]
- 5.26.2 Test conditions
- 5.26.3 Requirements
- 5.27 Substrate bending test (for surface mount thermistors only) [Go to Page]
- 5.27.1 General
- 5.27.2 Initial measurements
- 5.27.3 Test procedures
- 5.27.4 Final inspection and requirements
- 5.28 Component solvent resistance [Go to Page]
- 5.28.1 General
- 5.28.2 Initial measurements
- 5.28.3 Test conditions
- 5.28.4 Requirements
- 5.29 Solvent resistance of marking [Go to Page]
- 5.29.1 General
- 5.29.2 Test conditions
- 5.29.3 Requirements
- 5.30 Salt mist [Go to Page]
- 5.30.1 General
- 5.30.2 Test conditions
- 5.31 Sealing
- 5.32 Composite temperature/humidity cycle [Go to Page]
- 5.32.1 General
- 5.32.2 Initial measurements
- 5.32.3 Test conditions
- 5.32.4 Final inspection, measurements and requirements
- Annex A (normative) Interpretation of sampling plans and procedures as described in IEC 60410:1973 for use within quality assessment systems [Go to Page]
- A.1 Clause and subclause numbers of IEC 60410:1973
- Annex B (normative) Rules for the preparation of detail specifications for directly heated thermistors for electronic equipment for use within quality assessment systems [Go to Page]
- B.1 Drafting
- B.2 Reference standard
- B.3 Circulation
- Annex C (informative) Typical examples of mountings for measurements ofdirectly heated thermistors [Go to Page]
- C.1 Mounting for surface mount thermistors
- Figure C.1 – Mounting for measurements of surface mount thermistors
- Annex D (informative) Reference to IEC 60539-1:2008
- Annex Q (normative) Quality assessment procedures [Go to Page]
- Q.1 General
- Q.2 Primary stage of manufacture
- Q.3 Structurally similar components
- Q.4 Qualification approval procedures [Go to Page]
- Q.4.1 General
- Q.4.2 Test procedure for qualification approval
- Q.4.3 Maintenance of qualification approval
- Q.5 Quality conformance inspection
- Q.6 Certified test records of released lots
- Q.7 Delayed delivery
- Q.8 Release for delivery under qualification approval before the completion of group B tests
- Q.9 Alternative test methods
- Q.10 Unchecked parameters
- Bibliography [Go to Page]