Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN 15502-2-1:2022+A1:2023 Gas-fired central heating boilers - Specific standard for type C appliances and type B2, B3 and B5 appliances of a nominal heat input not exceeding 1 000 kW, 2024
- undefined
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and symbols
- 4 Classification
- 5 Construction [Go to Page]
- 5.4.6.101 General
- 5.4.6.102 Air supply and combustion products evacuation ducts
- 5.4.6.103 Terminal
- 5.4.6.104 Terminal guard
- 5.4.6.105 Fitting piece
- 6 Electrical safety
- 7 Controls
- 8 Operational requirements [Go to Page]
- 8.1.2.1 Installation of the boiler
- 8.1.2.2 Gases used for testing
- 8.1.2.3 Conduct of test to obtain a heat input
- 8.1.2.4 Water circuit
- 8.1.2.5 Thermal equilibrium
- 8.1.2.6 General test conditions for combination boilers
- 8.1.2.7 Electrical supply
- 8.1.2.8 Tolerances of measurements
- 8.1.2.101 Pressure differences at different operational situations for type C(10) boilers
- 8.1.2.102 Pressure differences at different operational situations for type C(11) boilers
- 8.2.2.101 General
- 8.2.2.102 Soundness of the air supply and combustion product circuit type C boilers
- 8.2.2.103 Soundness of the combustion product circuit of type B boilers
- 8.4.101.1 Heat input at maximum functional pressure difference at maximum heat input
- 8.4.101.2 Heat input at maximum safety pressure difference at minimum heat input
- 8.5.101.1 Requirements
- 8.5.101.2 Test conditions
- 8.6.2.101 Additional requirements for type C(10) boilers and C(11) boiler modules
- 8.6.3.101 Requirements for ignition, cross lighting and combustion stability
- 8.6.3.102 General test conditions
- 8.6.3.103 Test conditions for Type C1, C3 and C9 boilers
- 8.6.3.104 Test conditions for type C2 boilers
- 8.6.3.105 Test conditions for type C4 boilers
- 8.6.3.106 Test conditions for type C5 boilers
- 8.6.3.107 Test conditions for type C6 boilers
- 8.6.3.108 Test conditions for type C7 boilers
- 8.6.3.109 Test conditions for type C8 boilers
- 8.6.3.110 Test conditions for type C(10) boilers
- 8.6.3.111 Test conditions for type C(11) boilers
- 8.6.3.112 Test conditions for type B2, B3 boilers
- 8.6.3.113 Test conditions for type B5 boiler
- 8.6.101.1 Requirements
- 8.6.101.2 Test conditions
- 8.9.102.1 Determination of the pre-purge volume
- 8.9.102.2 Determination of the pre-purge time
- 8.9.102.3 Test for safely weaving pre-purge under safety of operation condition
- 8.11.6.1 Thermoelectric device
- 8.11.6.2 Automatic burner control system
- 8.11.101.1 Requirement for air proving
- 8.11.101.2 Air proving by supervision of the combustion air rate or the combustion products rate
- 8.11.101.3 Air proving by using gas/air ratio controls
- 8.11.101.4 Functioning of the fan of a type C4 boiler
- 8.12.2.1 Test description
- 8.12.2.2 Requirements
- 8.12.2.3 Test conditions
- 8.12.3.1 Incomplete combustion
- 8.12.3.2 Supplementary test for fan assisted boilers
- 8.12.3.3 Flame lift
- 8.12.3.101 Special flue conditions
- 8.16.101.1 Requirements
- 8.16.101.2 Test conditions
- 8.16.102.1 Nominal working combustion products temperature
- 8.16.102.2 Overheat combustion products temperature
- 8.101.2.1 Duct sections and fittings
- 8.101.2.2 Ducts support
- 8.101.2.3 Vertical terminals
- 8.101.3.1 Flexural tensile strength
- 8.101.3.2 Components subject to wind load
- 8.102.2.1 Characterization
- 8.102.2.2 Long-term resistance to thermal load
- 8.102.2.3 Long-term resistance to condensate exposure
- 8.102.2.4 Resistance to condensing/non-condensing cycling
- 8.102.2.5 Resistance to ultraviolet radiation (UV)
- 8.102.2.6 Geometrical stability
- 8.102.2.7 Reaction to fire
- 8.103.8.1 Durability
- 8.103.8.2 Strength
- 8.104.5.1 Requirements
- 8.104.5.2 Test methods
- 8.104.5.3 Risk assessment in case of a failing non-return valve
- 9 Useful efficiencies
- 10 Electric auxiliary energy
- 11 Risk assessment
- 12 Marking and instructions [Go to Page]
- 12.2.1.1 General
- 12.2.1.2 For installation and adjustment of the gas circuit
- 12.2.1.3 For installation on the central heating circuit
- 12.2.1.4 For installation of the combustion circuit
- 12.2.1.5 For boilers intended to be installed in a partially protected place
- Figures
- Listing of tables and numbers
- Annexes
- Annexes A-V, AA, AB, AC and ZA
- Annex A A(normative)Test apparatus for type C2 boilers
- Annex X B(normative)Test methods to determine the effects of long-term thermal load, long-term condensate exposure, condensing/non-condensing cycling and resistance to UV radiation
- Annex Y C(informative)This annex is empty on purpose
- Annex Z D(informative)Example on calculation of common duct system for type C(11) boilers
- Annex ZA (informative)Left empty on purpose
- Annex ZB (informative)Clauses of this European Standard addressing the methods for the verification of the efficiency of the EU Directive 92/42/EEC, relating to the efficiency of new hot boilers with an output of (4 – 400) kW
- Annex ZC (informative)Relationship between this European Standard and the ecodesign requirements of Commission Regulation (EU) No 813/2013 L 239/136 aimed to be covered
- Annex ZD (informative)Relationship between this European Standard and the energy labelling requirements of Commission Delegated Regulation (EU) No 811/2013 L 239/1 aimed to be covered
- Annex ZE (informative)Relationship between this European Standard and the essential requirements of Regulation (EU) 2016/426 of the European Parliament and of the Council of 9 March 2016 on appliances burning gaseous fuels and repealing Directive 2009/142/EC aimed to be covered [Go to Page]