Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN 12889:2022 Trenchless construction and testing of drains and sewers, 2022
- undefined
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General [Go to Page]
- 4.1 Technical principles
- 4.2 Safeguarding design decisions
- 5 Construction components and materials [Go to Page]
- 5.1 General
- 5.2 Pipes and joints
- 5.3 Manholes and inspection chambers
- 5.4 Delivery, handling and transportation on site
- 5.5 Storage
- 5.6 Other materials
- 6 Techniques [Go to Page]
- 6.1 Classification
- 6.2 Unmanned techniques [Go to Page]
- 6.2.1 General
- 6.2.2 Non-steerable techniques [Go to Page]
- 6.2.2.1 General
- 6.2.2.2 Soil displacement techniques
- 6.2.2.3 Soil removal techniques
- 6.2.3 Steerable techniques [Go to Page]
- 6.2.3.1 Microtunnelling
- 6.2.3.2 Pilot pipe jacking
- 6.2.3.3 Directional drilling (also called HDD – Horizontal directional drilling)
- 6.3 Manned techniques [Go to Page]
- 6.3.1 General
- 6.3.2 Non-steerable techniques
- 6.3.3 Steerable techniques [Go to Page]
- 6.3.3.1 General
- 6.3.3.2 Shield (open) with partial working face excavation, with or without supporting slope, with or without mechanical support
- 6.3.3.3 Shield (open) with partial working face excavation, with or without supporting slope, with or without mechanical support under compressed air
- 6.3.3.4 Shield (open) with cutting wheel, with or without mechanical support, under or not under compressed air
- 6.3.3.5 Shield (closed) with full face excavation and fluid support and compressed air (Mixshield)
- 6.3.3.6 Shield (closed) with full face excavation and earth pressure balance (EPB shield)
- 6.3.4 Other manned techniques [Go to Page]
- 6.3.4.1 General
- 6.3.4.2 Heading
- 7 Requirements of planning and construction [Go to Page]
- 7.1 General
- 7.2 Basic evaluation, design and construction planning [Go to Page]
- 7.2.1 General
- 7.2.2 Survey of existing structures and systems
- 7.2.3 Ground and groundwater
- 7.2.4 Minimum clear dimensions
- 7.2.5 Subsidence, heaves, cover
- 7.2.6 Layout of the line
- 7.2.7 Tolerances
- 7.2.8 Starting, intermediate and target pits
- 7.2.9 Working face support
- 7.2.10 Additional measures in water bearing ground
- 7.2.11 Obstacles
- 7.2.12 Soil conditioning
- 7.2.13 Structural calculation
- 7.2.14 Construction site arrangement
- 7.3 Work preparation and construction [Go to Page]
- 7.3.1 General
- 7.3.2 Starting, intermediate and target pits
- 7.3.3 Exit and entry processes
- 7.3.4 Static calculation of launch and reception shafts
- 7.3.5 Overcut
- 7.3.6 Recording and logging of jacking parameters
- 7.3.7 Support of the working face
- 7.3.8 Lubricant and supporting medium
- 7.4 Avoidance of damage
- 8 Inspection and testing of pipelines after installation [Go to Page]
- 8.1 General
- 8.2 Visual inspection
- 8.3 Leaktightness
- 9 Qualifications
- Annex A (informative)Additional information about the different systems
- Annex B (informative)Guide to typical ranges of application regarding diameters and lengths in suitable soil
- Annex C (informative)Guide to typical ranges of application for selected trenchless techniques regarding diameters and lengths in suitable soils
- Annex D (informative)Trenchless insertion using a pipe plough system [Go to Page]