Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

BS 5440-1:2023 Chimneys, flue pipes and ventilation for gas appliances of rated input not exceeding 70 kW net (1st, 2nd and 3rd family gases) - Design, installation, commissioning and maintenance of chimneys. Specification, 2023
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Competence
- 5 General [Go to Page]
- 5.1 Compatibility of appliances and chimneys
- 5.2 Chimney outlets
- 5.3 Chimneys for use with condensing appliances (open-flued and room-sealed)
- 5.4 Location of appliances
- 5.5 Passive stack ventilation
- 5.6 Exchange of information and planning
- 5.7 Maintenance
- 6 Room-sealed natural draught chimney configurations (balanced flue) for Type C11 appliances [Go to Page]
- 6.1 General
- 6.2 Installation
- 6.3 Post-installation checks
- 6.4 Maintenance
- 7 Room-sealed: fanned draught chimney configurations for balanced flue (Type C12, C13, C32 and C33) and non-balanced flue (Type C52, C53, C62 and C63) appliances [Go to Page]
- 7.1 Design options
- 7.2 Installation
- 7.3 Post-installation checks
- 7.4 Maintenance
- 8 Balanced compartment [Go to Page]
- 8.1 General
- Figure 1 — Balanced compartment installations
- 8.2 Design
- 8.3 Balanced compartment construction
- 8.4 Temperature effects
- 8.5 Terminals
- 8.6 Commissioning
- 8.7 Maintenance
- 9 Room-sealed Type C2 for SE-ducts and U-ducts [Go to Page]
- 9.1 Selection and installation of a suitable chimney
- Table 1 — Normal SE-duct block sizes in existing buildings
- Figure 2 — Shared room-sealed systems
- Figure 3 — Base of communal flue system – naturally vented
- Figure 4 — Base of positive pressure communal flue system
- 9.2 Terminal design and location
- 9.3 Inspection
- 9.4 Selection and installation of compatible appliances
- 9.5 Maintenance
- 10 Individual open-flued natural draught Types B11, B12, B13 appliances [Go to Page]
- 10.1 Design
- Figure 5 — Typical methods of using a flue liner in a masonry chimney installation serving a gas appliance, other than a back boiler
- Figure 6 — Installation of a gas fire and combined back boiler using a back boiler enclosure and prefabricated chimney: enclosure arrangement using a false chimney breast and closure panel
- Figure 7 — Installation of a gas fire and combined back boiler using a back boiler enclosure and prefabricated chimney: enclosure arrangement using a proprietary back boiler box
- Table 2 — Condensate-free lengths of individual open flue used with a gas fire
- Figure 8 — Maximum lengths for condensate-free chimneys for appliances other than gas fires
- Table 3 — Minimum void dimensions required below appliance connections
- Table 4 — Appliance/chimney combinations which require the chimney to be lined
- Figure 9 — Open-flued boiler connections to existing brick chimney
- 10.2 Installation
- 10.3 Commissioning of the chimney
- 10.4 Radon gas systems present
- 10.5 Maintenance
- 11 Individual open-flued fanned draught Types B14, B22, B23 appliances and fanned draught chimneys [Go to Page]
- 11.1 Design
- 11.2 Installation
- 11.3 Commissioning
- Table 5 — Minimum flow rates for fanned flues
- 11.4 Maintenance
- 12 Special categories of chimney [Go to Page]
- 12.1 Chimneys for Type C7 (“Vertex”) appliances
- 12.2 Other open-flued fanned draught chimneys
- 13 Maintenance/routine checks on the chimney/flue system [Go to Page]
- 13.1 General
- 13.2 Room-sealed fan-assisted positive pressure gas appliances
- 13.3 Balanced compartment
- 13.4 Individual open-flued natural draught Types B11, B12, B13, B14, B22, B23 appliances
- Annex A (informative) Classifications [Go to Page]
- Table A.1 — Classification of gas appliances used in the UK according to the method of evacuation of products of combustion (types)
- Table A.2 — Default values
- Annex B (informative) Calculation method for flue sizing [Go to Page]
- Table B.1 — Resistance factors for use in calculating equivalent heights (Use specific factors from flue or chimney manufacturer’s instructions where possible)
- Table B.2 — Inlet and outlet resistances
- Table B.3 — Minimum equivalent heights needed
- Figure B.1 — Worked example 1
- Figure B.2 — Worked example 2
- Annex C (normative) Chimney outlet positions [Go to Page]
- Figure C.1 — Open-flued, natural draught chimney outlet locations for pitched roofs
- Figure C.2 — Open-flued, natural draught chimney outlet locations adjacent to structures
- Figure C.3 — Open-flued or room-sealed, natural or fanned draught chimney outlet locations adjacent to openings into a building on pitched roofs
- Figure C.4 — Open-flued, natural draught chimney outlet locations on flat roofs
- Figure C.5 — Open-flued, natural draught chimney outlet
- Figure C.6 — Room-sealed configuration outlet location on pitched roofs
- Figure C.7 — Open-flued, fanned draught chimney and room-sealed configuration outlet locations adjacent to structures on pitched roofs
- Figure C.8 — Chimney outlet positions (see Table C.1 for key to open-flued chimney outlets and for room-sealed chimney configuration outlets)
- Table C.1 — Minimum dimensions of chimney outlet positions (refer to Figure C.8)
- Figure C.9 — Example of how a natural draught, room-sealed chimney configuration outlet position is measured
- Figure C.10 — Example of how a fanned draught room-sealed chimney configuration outlet and a fanned draught open-flued chimney outlet position is measured
- Figure C.11 — Proximity of flue duct outlet to a boundary
- Annex D (informative) Guidance checklist for positioning of chimney/flue terminations [Go to Page]
- Table D.1 — Guidance checklist
- Annex E (informative) Checking of case seals and the general integrity of room-sealed fan‑assisted positive pressure gas appliances [Go to Page]
- Figure E.1 — Checklist for checking case seals and the general integrity of room-sealed fan‑assisted positive pressure gas appliances
- Annex F (normative) Design criteria for terminals for shared system chimneys [Go to Page]
- Figure F.1 — Permitted recirculation of combustion products
- Annex G (informative) Guidance on the design and installation of flue block systems in the UK [Go to Page]
- Figure G.1 — Gas flue blocks
- Figure G.2 — Typical flue block systems (general arrangement)
- Figure G.3 — Bonded gas flue block system for timber frame construction
- Figure G.4 — Typical construction details for gas flue block systems in internal walls
- Figure G.5 — Typical construction details for gas flue block systems in external walls
- Bibliography [Go to Page]