Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN 1594:2024 - TC Tracked Changes. Gas infrastructure. Pipelines for maximum operating pressure over 16 bar. Functional requirements, 2024
- A-30442411.pdf [Go to Page]
- undefined
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Quality and management systems
- 5 Safety and the environment [Go to Page]
- 5.1 General
- 5.2 Appropriate safety measures
- 5.3 Routing considerations [Go to Page]
- 5.3.1 General
- 5.3.2 Surveys
- 5.3.3 Environmental impact
- 5.3.4 Ground conditions
- 5.4 Line valve spacing
- 6 Pressure safety [Go to Page]
- 6.1 Pressure levels
- 6.2 Normal operation
- 6.3 Requirements for installation of pressure safety devices
- 6.4 Pipeline with DP equal to or less than 40 bar and hoop stress ≤ 0,45 Rt0,5
- 6.5 Pipeline with DP equal to or less than 24 bar and hoop stress ≤ 0,30 Rt0,5
- 7 Design [Go to Page]
- 7.1 General [Go to Page]
- 7.1.1 Design principles
- 7.1.2 Basis of design [Go to Page]
- 7.1.2.1 Pipeline
- 7.1.2.2 Pipeline sections
- 7.2 Wall thickness determination [Go to Page]
- 7.2.1 Straight pipe
- 7.2.2 Bends and elbows
- 7.3 Additional design requirements [Go to Page]
- 7.3.1 Forces
- 7.3.2 Soil engineering data required
- 7.3.3 Structural models for pipeline sections
- 7.4 Analysis of stress and strain [Go to Page]
- 7.4.1 Elastic and extended elastic design [Go to Page]
- 7.4.1.1 General
- 7.4.1.2 Resultant stress
- 7.4.1.3 Allowable resultant stress
- 7.4.2 Limit state design [Go to Page]
- 7.4.2.1 General
- 7.4.2.2 Relevant limit states
- 7.5 Design report
- 7.6 Land management and geotechnical studies
- 7.7 Depth of cover
- 7.8 Casing pipes
- 7.9 Station design [Go to Page]
- 7.9.1 Layout
- 7.9.2 Components
- 7.9.3 Interaction with onshore pipeline section
- 7.9.4 Station pipework
- 7.10 Pipeline components
- 7.11 Pigging suitability
- 7.12 Arrangements for venting, recompression and flaring
- 7.13 Corrosion protection [Go to Page]
- 7.13.1 General
- 7.13.2 External coating [Go to Page]
- 7.13.2.1 External coating for above-ground pipeline sections
- 7.13.2.2 External coating for buried pipeline sections
- 7.13.3 Cathodic protection [Go to Page]
- 7.13.3.1 Basic requirement
- 7.13.3.2 Electrical interference
- 7.13.3.3 Insulation joints
- 7.13.3.4 Commissioning
- 7.14 Grid connections
- 8 Materials and components [Go to Page]
- 8.1 General [Go to Page]
- 8.1.1 Base material
- 8.1.2 Manufacturing requirements
- 8.1.3 Manufacturing procedure
- 8.1.4 Weldability [Go to Page]
- 8.1.4.1 General
- 8.1.4.2 Pipe
- 8.1.4.3 Other pipeline components
- 8.1.5 Mechanical properties [Go to Page]
- 8.1.5.1 Impact energy
- 8.1.5.2 Impact test temperature
- 8.1.5.3 Tensile properties
- 8.1.5.4 Hardness of welds
- 8.1.5.5 Properties after forming and heat treatment
- 8.1.6 Inspection documents [Go to Page]
- 8.1.6.1 Manufacturing under a comprehensive quality system
- 8.1.6.2 Manufacturing not under a comprehensive quality system
- 8.1.6.3 Small components
- 8.1.7 Other steel types or grades
- 8.1.8 Records
- 8.2 Pipes
- 8.3 Fittings [Go to Page]
- 8.3.1 General
- 8.3.2 Manufacturing
- 8.4 Flanged connections
- 8.5 Insulating connections [Go to Page]
- 8.5.1 Type test
- 8.5.2 Strength test
- 8.5.3 Electrical test
- 8.5.4 External tightness test
- 8.6 Valves
- 8.7 External and internal coatings
- 8.8 Welding end preparation
- 9 Construction [Go to Page]
- 9.1 General
- 9.2 Execution of work [Go to Page]
- 9.2.1 General
- 9.2.2 Marking out the site
- 9.2.3 Initial site inspections
- 9.2.4 Working strip
- 9.2.5 Separation of topsoil
- 9.2.6 Trenches
- 9.2.7 Crossing and proximity of buried structures (cables and pipes)
- 9.2.8 Handling and stringing
- 9.2.9 Bends [Go to Page]
- 9.2.9.1 Elastic bends
- 9.2.9.2 Field bends
- 9.2.10 Welding and weld examination
- 9.2.11 External coating [Go to Page]
- 9.2.11.1 General
- 9.2.11.2 Surface preparation, application conditions
- 9.2.11.3 Coating welded joints and uncoated parts of pipes
- 9.2.11.4 Repairing the coating
- 9.2.11.5 Coating valves, fittings and cable-to-pipe connections
- 9.2.11.6 Inspections
- 9.2.11.7 Mechanical protection
- 9.2.11.8 Rocky ground
- 9.2.11.9 Trenchless
- 9.2.12 Lowering into the trench
- 9.2.13 Ballasting and anchoring
- 9.2.14 Tie-ins
- 9.2.15 Backfill
- 9.2.16 Reinstatement
- 9.2.17 Markings
- 9.2.18 Final site inspection with owners and users
- 9.3 Special crossings [Go to Page]
- 9.3.1 General
- 9.3.2 Open-trench road or path crossings
- 9.3.3 Trenchless crossings
- 9.3.4 Requirements for casings
- 9.3.5 Open trench major water crossings
- 9.3.6 Horizontal directional drilling
- 9.4 Cleaning
- 9.5 Testing [Go to Page]
- 9.5.1 General
- 9.5.2 Test preparation
- 9.5.3 Strength test
- 9.5.4 Tightness test
- 9.5.5 Pre-testing
- 9.5.6 Dewatering
- 9.5.7 Golden welds
- 9.6 Acceptance [Go to Page]
- 9.6.1 As-built documents
- 9.6.2 Pre-commissioning
- 9.6.3 Handover and documentation
- 10 Operation and maintenance [Go to Page]
- 10.1 General [Go to Page]
- 10.1.1 Policy
- 10.1.2 Safety and environment
- 10.2 Organization
- 10.3 Operating and maintenance instructions
- 10.4 Emergency plan
- 10.5 Records and documentation
- 10.6 Commissioning
- 10.7 Decommissioning
- 10.8 Recommissioning
- 10.9 Maintenance, modification, and repair [Go to Page]
- 10.9.1 General
- 10.9.2 Pipeline surveillance, inspection and monitoring
- 10.9.3 Execution of repairs and modifications
- 10.9.4 Work involving cutting of the pipeline
- 10.9.5 Work on in-service pipelines
- 10.9.6 Repairs after emergency
- 10.9.7 Other and special maintenance activities
- 10.10 Introduction of hydrogen in existing natural gas pipelines
- 10.11 Abandonment and removal
- Annex A (normative)Requirements for fracture arrest of line pipe [Go to Page]
- A.1 General
- A.2 CVN impact test
- A.3 Drop weight tear test
- A.4 Test pieces, method, and frequency for CVN and DWT tests
- Annex B (informative)Hydrogen gas pipelines [Go to Page]
- B.1 General
- B.2 New pipelines
- B.3 Existing pipelines
- B.4 Other considerations [Go to Page]