Cart (0)
  • No items in cart.
Total
$0
There is a technical issue about last added item. You can click "Report to us" button to let us know and we resolve the issue and return back to you or you can continue without last item via click to continue button.
Search book title
Enter keywords for book title search
Search book content
Enter keywords for book content search
Filters:
FORMAT
BOOKS
PACKAGES
EDITION
to
PUBLISHER
(1)
(326)
(573)
(44)
(234)
(969)
(652)
(2114)
(64)
(92448)
(54)
(541)
(117)
(33)
(21)
(20)
(93277)
(3)
(17)
(1)
(351)
(300)
(6217)
(240)
(16)
(5)
(1635)
(16)
(19)
(28)
(4)
 
(6)
(7)
(115)
(3)
(57)
(5)
(5)
(1)
(1)
(2)
(25)
(26)
(27)
(13)
(61)
(24)
(22)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(31)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Product - Data Sheet
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Sustainability
 Technical Bulletin
 All
  • BSI
    BS EN 14899:2005 Characterization of waste. Sampling of waste materials. Framework for the preparation and application of a sampling plan
    Edition: 2006
    $411.69
    / user per year

Description of BS EN 14899:2005 2006

This European Standard specifies the procedural steps to be taken in the preparation and application of a Sampling Plan. The Sampling Plan describes the method of collection of the laboratory sample necessary for meeting the objective of the testing programme. The principles or basic rules outlined in this European Standard, provide a framework that can be used by the project manager to: produce standardised Sampling Plans for use in regular or routine circumstances (elaboration of daughter/derived standards dedicated to well defined sampling scenarios); incorporate the specific sampling requirements of European and national legislation; design and develop a Sampling Plan for use on a case by case basis. This European Standard has been developed for the characterization of waste. There may be a need for more than one Sampling Plan to meet all the requirements of the testing programme. Ultimately the Sampling Plan provides the sampler with detailed instructions on how sampling should be carried out. NOTE Although this European Standard in most cases refers to the taking of one sample or increment or the preparation of one laboratory sample, it should be noted that often this should be more than one. For simplicity reasons this European Standard uses singular terms, while plural terms are also possible or even likely.

About BSI

BSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses.

X